Live stream not working in Chrome or Edge?

Bookmark list

* use Ctrl+F (Cmd+F on Mac) to search in document
Loading...
Unable to preview the file.

Transcript

Do you? 00:00:00
OK, excellent. So I'm going to just take the date again. It's September 8th, it's Wednesday 2000, the year 2021 and the time is 00:00:04
638. And I'm going to call to order the Vineyard Redevelopment Agency and we'll move right into the consent agenda. So I just need 00:00:10
a motion. 00:00:16
I'll make a motion. 00:00:24
To approve the cons. 00:00:26
Item 2.1 all in favor. 00:00:28
OK, number 3.1 is a site plan and conditional use permit application for the Golf outdoor recreation facility. 00:00:33
I don't have prime. Are you starting on this? OK, go ahead. 00:00:42
Thank you. OK. So the applicant is Paul Straits. He's with Arco Murray. He's representing Tough Call for International Inc. 00:00:48
This specific project is in the RMU. 00:00:57
The property owners of the of the parcel are 50 Mill LLC and X Development. This is in the yard Plat B and and this land use is is 00:01:01
commercial recreation outdoors. The size of the law is 461,000 square feet and the building is 24,257 with 72 hitting base. So 00:01:09
it's basically. 00:01:17
A golf facility that also has like a restaurant. 00:01:28
And a bar also have mini golf and it's a really it's a premier sports entertainment venue with a few accessory uses as well. They 00:01:32
have installation of of netting. 00:01:38
Sorry, netting and pulls not to exceed 156 feet. Our code allows for both to go up to 180. They also have outdoor seating and 00:01:45
dining areas and an outdoor patio. 00:01:51
It meets the project needs, our building design and site planning guidelines. 00:01:58
In terms of architecture, they need a lot of Maybe they need all of our zoning code requirements. The design, the architectural 00:02:04
design reduces. 00:02:09
Overall size and mass of the of the building, the surface details and richer character of the building. It provided variation in 00:02:15
building materials and colors and. 00:02:20
They also meet all of our lighting Sanders. They provide a photometric plan that shows that the effect of lighting on the building 00:02:27
isn't going to have have a severe impact on the surrounding building or land uses. 00:02:34
And the building itself functions harmoniously with other structures around it. They meet over all of our landscaping codes. 00:02:41
The landscaping provides visual interest, variety and year round beautification. 00:02:50
Umm. 00:02:56
And. 00:02:57
They've met all of our parking and loading requirements as well. They've provided more than enough parking, bicycle parking, 88 00:02:59
parking. 00:03:02
They are providing convenient and effective ways of circulating vehicles and pedestrians around the site. 00:03:07
A few things to note. The signage that is proposed on this site plan will not be approved until they submit formally for a sign 00:03:15
permit. 00:03:20
And also the digital TV screens, the large digital TV screens at the end of the driving range are not being approved with this 00:03:26
application either. 00:03:31
So I'm just going to jump into. 00:03:37
Where they brought forward in the last discussion and then separated, yeah, they were. So basically the situation with that is our 00:03:41
zoning. We don't have anything in our zoning code that facilitates an approval of this. So that's something that a discussion that 00:03:47
we have to have in the future and and be able to. 00:03:52
See if that's something that we want to consider into our zoning code and and find out a way to to have it. 00:03:59
So we'd have to write something to to accommodate. 00:04:06
But the digital? 00:04:10
Signage on the buildings. Will that conduct through City Council then? 00:04:13
That would be a zoning text amendment. 00:04:18
So it would have to, yeah, we didn't, we didn't feel very confident that we had the code in place to to be able to deal with 00:04:21
something at that that that magnitude. It's a little different than like having a sports bar or maybe you have a porch and ATV out 00:04:26
there and these are massive TV's. 00:04:32
So Brian, can you show them on the site plan if they they point towards, so the base you're hitting, you're able to watch like a 00:04:37
sports game at the back right here? 00:04:41
So right where I'm hovering my mouse are here, they're pointing to the West. They're pointing to the West. Yeah, so. 00:04:46
No. 00:04:54
So, So are you saying that it would come back to the City Council, Morgan? 00:04:58
We would need to do some sort of legislative change so we could fit that, but the sign, the signs for the building, didn't we just 00:05:04
cover that. 00:05:08
Yeah. So now we have a legal way to get their signs approved. They just have. 00:05:12
Submit the permit applies to the permit and then they could Brian just to clarify so so the the did those digital boards are 00:05:18
aren't signage there that's to watch games and and you know so we would just have to look at our code and see how we would fit 00:05:25
that in but this the science works there you go. 00:05:31
Someone's perception. 00:05:41
OK, so these are the. 00:05:45
Elevations of the building. 00:05:49
Yeah, trying to. 00:05:50
There we go, yeah. So the the sign, the two, the three signs that are on this front elevation would would be able to be permitted 00:05:55
outrightly by our our, our something that we are signed. 00:06:02
Yeah, code amendment that we just approved. So yeah, if if they would go through the the application process they would, they 00:06:12
would be fine. 00:06:15
Good question. Is this the same size as the one in South Jordan? The one in South Jordan is 3 levels, so it's a little smaller. 00:06:20
This one is a little smaller than the a little smaller. 00:06:29
Are there any amenities that are coming in because this is a new one that maybe we don't know about yet that you've heard of that 00:06:33
are? 00:06:36
We could pass along because I mean, obviously I'm excited about this. Yeah, yeah, it's very exciting actually. The we have a 00:06:39
representative of representative for the happening if he wants to come to the mic and tell us a little bit about it. 00:06:45
Steve Hutchings with X Development and 50 mil. 00:06:56
So different amenities, Brian, if you could go up to the site plan scroll, I think maybe like 5 pages. 00:07:00
So they do have an amenity that's not in the Mid Bell location, which is an outdoor space. It's an outdoor patio. 00:07:08
Do you want to zoom in as close as you can to the kind of southern part of that? 00:07:14
You can see on the southern part of the building, right where the cursor is. They're gonna have like some outdoor games there. 00:07:19
That's open, open air patio. 00:07:23
I've got some tables and different things. 00:07:28
They've done this in multiple facilities and. 00:07:31
There. 00:07:34
And they've been really successful. 00:07:36
That's. 00:07:38
It's a good place. You have any other questions? Were you thinking food? What other amenities were you looking at? 00:07:39
OK. 00:07:49
I have a quick question. So I saw the dates on the application, but what's the hopeful timeline? 00:07:51
And so initially when we signed the deal with Top Golf, they wanted to start. 00:07:57
The end of first quarter to start up the second quarter 2022. 00:08:03
That timeline has been bumped up and they're trying to start as soon as possible. City staff has been really good to work with and 00:08:10
accommodating with that accelerated time frame. What they try, they're they're trying to open 11 locations in 2022, so they try to 00:08:16
stack them every single year or every single month. 00:08:22
And I think they had an opening or something. I'm not really clear on what all the all of a sudden pushes. 00:08:28
But all of a sudden they're saying we want to start by Christmas this year and be completed by Christmas 2022. That's great. 00:08:36
We love that on our side. That's great. Especially do they have any questions on materials or anything that they're working with? 00:08:45
Are they feeling like that's going to go smoothly for them? 00:08:50
They they build enough of these and they work with the same contractor that they know, they know exactly what material. That's 00:08:56
great to get right now. And we're building you know, multiple retail buildings, some in Vineyard, some in other cities and you 00:09:02
know some of the the steel trusses, wood trusses are six months out. 00:09:08
But there are 10 to 12 month construction period and so they're already ordering stuff, OK, And they were just speaking with staff 00:09:14
about. 00:09:18
You know, getting an application and for a building permit, you know, I don't think we're quite ready for that. We have some. 00:09:22
Frontline adjustments and a couple things to do on our side, but there I think there's that way that. 00:09:28
Like a lot line. 00:09:35
Our old parcel with a little bit skinnier, OK, let's talk about now is wider and they have parking on the side of the building and 00:09:36
so we'll need to modify that property line. 00:09:41
Any questions from the Council for? 00:09:47
Awesome. 00:09:51
OK. 00:09:53
See, I just want to show you guys the conditions of approval that we have that the Planning Commission recommended. 00:09:55
Umm. 00:10:04
Whoops, I just moved over here. 00:10:06
Page 2. 00:10:10
OK, so here are the conditions of approval. Sign permit application shall be submitted with the proposed signage on the building. 00:10:19
The digital screen shall be approved. Shall not be approved with this application and the applicant shall follow all bike rack 00:10:26
general requirements So they they provided the right amount of bike racks. We just we've asked them to provide a a bike rack 00:10:32
design that meets all of our other codes in terms of. 00:10:38
Like being able to lock them up safely and conveniently and all. 00:10:45
And then the applicant pay any alternate fees and red lines and make any red line corrections. And then the applicant is subject 00:10:49
to all federal, state and local laws. OK, Steve, can I have you come back up? 00:10:54
Did you feel like things went well in the Planning Commission and the applicant felt fine with the way the signs were going and 00:11:02
they understand our process and our need to put in our codes? 00:11:07
After to celebrate, which is great. 00:11:13
It was on that, you know, it was their treat they said that they would take. 00:11:19
We explained to them the situation with the signs and we told them that, you know, we're working through a process and that we 00:11:23
don't want them to get discouraged with that and that, you know, things are looking positive too. 00:11:29
Their Their signage, the way they want it. Excellent. 00:11:35
Any other questions? No. OK. 00:11:39
So. 00:11:52
Remarkable. Can we go ahead and make a motion? I think so. I don't. I don't think you need a motion for this. 00:11:53
They're just looking for feedback from the. 00:12:00
I would just say for staff. 00:12:05
Easy as we can make the digital screen process, Let's try to do that right? Absolutely. 00:12:07
You do that. 00:12:13
Yeah. 00:12:14
Awesome. Thank you. Thank you. 00:12:17
All right. Well, let's go ahead and move into our 4.1 discussion action, modified dates and the Tax Increment Participation 00:12:21
Agreement with the Vineyard Redevelopment Agency Board and 50 mil LLC. So I'll, I'll present this for Jamie we have been talking 00:12:27
with. 00:12:33
Their attorney. 00:12:41
About. 00:12:43
Modifying the contract and and there's some force majeure language in there that would allow an extension of the agreement. 00:12:44
But rather than have any ambiguity out there, we just wanted to clarify it and modify the the existing agreement. And so the 00:12:52
modification that we're recommending is adjusting the dates. There are two requirements for completion dates, one is for the top 00:12:58
golf facility and one is for the. 00:13:03
The medical office buildings, both of those were listed as October 10th of 2021. 00:13:10
After talking with them, it sounds like their timeline is coming quicker than they were expecting, but we want to provide some 00:13:17
flexibility there as well just in case they do hit some snags in the construction period. So we're after discussing it with them. 00:13:24
We're proposing to just extend those timelines from 2021 to 2023, so on both. 00:13:32
The top golf facility as well as the medical office buildings, obviously those are going to be constructed much quicker because. 00:13:39
One of them is already done and the other one's under construction right now. So but but rather than have any ambiguity out there 00:13:47
with the agreement or or deal with any of that, we just think that it'd be best if we extend those timelines to 2023. So I'm 00:13:53
really happy to hear that the materials and everything are already being ordered and it's going in this very quick process, but I 00:13:59
think it's wise to plan for it just because we don't know what's going to happen in the. 00:14:05
But the next wave? 00:14:11
The flu season and the cold season, so and what that means for material. So any questions from the council, I mean from the board. 00:14:14
I don't know if you have a proposed motion for this, but I would just, I would just say make a motion that you allow staff to 00:14:20
amend the contract and then have the chair sign it. 00:14:26
So moved. 00:14:33
OK. And a second. 00:14:35
Favor. OK, I just need a motion to adjourn and 2nd. 00:14:39
Thank you so much for coming. 00:14:44
Anything. 00:14:51