| Alright, so this is. | 00:00:08 | |
| To call in order the Development Review Committee for July 25, 2024. It is currently 9:05 AM Mountain Time. | 00:00:11 | |
| So. | 00:00:22 | |
| The business items that we have today is Cottonwood space side, but then in the cloud. And just to start off with, just do roll | 00:00:26 | |
| call. | 00:00:31 | |
| Alright, it started off correct. Sure. Yeah. Cash can't see uh, senior planner covering for Morgan. Eric Ellis, a city manager. | 00:00:36 | |
| Of a workshop engineer Chris Johnson, building official. | 00:00:44 | |
| Brandon Valley Fire Department, Brian Vaudrey, Parks and Rec Director. Thank you very much. OK, so we have one business lines and | 00:00:49 | |
| we currently have 4 tentative work sessions on the agenda. The 1st is design that we have is the work in the Cottonwood Stage five | 00:00:55 | |
| amendment class fire station site law consolidation. | 00:01:02 | |
| So Amtech group is requesting approval for talking with phase five amendment spot situation in regards to the fire station site | 00:01:10 | |
| squad consolidation is to reinitiate projects and I believe we have I I on a cash advance, a senior plan of presenting yeah. I | 00:01:17 | |
| mean this, this is a pretty basic uh, plat where we, we don't really do a lot on adjustment in our city. We just do final class | 00:01:24 | |
| and so that's what this is doing uh, in the cottonwoods since this was originally umm. | 00:01:30 | |
| Platted it was uh two separate lots, but since we're putting on the Firehouse on this lot, we need to combine them back to one lot | 00:01:38 | |
| umm and so that's what this plat does here so you can see lot 6545 is is the two blocks combined umm pretty pretty basic flat so. | 00:01:48 | |
| I don't know if you guys have any questions about it. | 00:01:59 | |
| And I looked over any kind of comments that might be on the spot. Umm, there's a planning, uh, department. Have any comments about | 00:02:04 | |
| this part? No. | 00:02:08 | |
| OK. And then over a public works engineering, uh, Patrick James, assistance engineer, congratulations. | 00:02:14 | |
| Yeah uh, do you have comments on this box there? Yeah, we just, we, we weren't able to make the comments yet in city inspect | 00:02:22 | |
| because it wasn't, uh, through the yeah, But uh, we, we did have a comment on the easement. If, if that's an easement or a set | 00:02:31 | |
| back shown, umm, around the property. Uh, we, we wouldn't need an easement around the entire property. | 00:02:39 | |
| Umm and then also. | 00:02:50 | |
| It it does look like it is an easement according to the legend. OK, it's it's not described I don't think anywhere. | 00:02:53 | |
| So. So the easement just needs to be described. | 00:03:01 | |
| Umm, what? You know, you have a full description for the easement and, uh, and we, we only need that on the two sides, uh, on the | 00:03:08 | |
| street, the street side, down the street side, umm, and then, and then the lot needs an, an address associated with it. | 00:03:16 | |
| And that address will be facing the South of 81 among the state. | 00:03:27 | |
| Hold on. | 00:03:32 | |
| I believe those were the only two comments. | 00:03:35 | |
| We noticed on that. | 00:03:41 | |
| Do you see that holding up for Corning or just comments we can make in get it recorded? Uh, the easement portion of it would have | 00:03:44 | |
| to be changed. OK, yeah. I mean in essence, uh, I mean. | 00:03:51 | |
| It doesn't need to be fully printed out. | 00:03:58 | |
| Uh, pretty much take out wired out and that sounds like very easy until I just be following the standard easement type for every | 00:04:02 | |
| app that there is for all the entire locks like this South southern corner lock. Sure, the easement is the way along alongside the | 00:04:08 | |
| roads, not not the side nor the backside. And of course the the address. Umm, it depends on the county's acceptance if it could be | 00:04:15 | |
| penciled, I don't know. OK. | 00:04:21 | |
| We can give those comments back to them. | 00:04:28 | |
| Those updates that I'll have to come back to DRC for a review of their administrative, uh, changes, OK. | 00:04:31 | |
| Go home with anything else. | 00:04:42 | |
| Oh, OK, fine. No, I don't think there's anything else on our side. All right, with that being said, uh, let me go around the room, | 00:04:45 | |
| see if anyone else has any comments. So planning department, Mr. Cash, Nancy, uh, Eric, no comment, no comments. I don't have any | 00:04:51 | |
| other further comments and, uh, know how much from building. | 00:04:57 | |
| You know, comments required and then the comments from parks. All right, with that being said, cash, is this fake roll call with | 00:05:04 | |
| those? Uh, yeah. All right. So, uh, do I have a motion? | 00:05:08 | |
| Motion to approve the item is presented with the. | 00:05:14 | |
| With the easement lines cleaned up and then and an address provided, I'll second that and we have a second, so we'll call or. | 00:05:19 | |
| OK, so let's just go with all in favor. | 00:05:31 | |
| Thank you very much. | 00:05:36 | |
| Alright, so the second thing on our item is the work session for the Venture City fire stations pipeline. Uh, and who's for that | 00:05:41 | |
| balancer? And that'll be me again. OK, so Mr. Kashi's senior planner, take it away. OK Yeah. So this is that site plan for the | 00:05:47 | |
| plant. We were just looking at, umm, if you've seen the Princeton plan that, that home center construction builds in these | 00:05:53 | |
| neighborhoods, you, you've seen this house before. Umm, it does include though this, you know, extra large garage. So for the | 00:05:58 | |
| fire. | 00:06:04 | |
| Apparatus umm, so this is the the site here. It is a lot of there is a lot of umm hardscape, especially in the the rear yard here. | 00:06:10 | |
| Umm and then I think there this doesn't quite show it, but there's also going to be an ADA accessible, uh door at the back of the | 00:06:18 | |
| building right here umm, with the sidewalk going out onto the street here. | 00:06:26 | |
| Umm, let me go to the rendering here. So this is what it looks like they are emitting this uh, fourth car garage section and I'm | 00:06:36 | |
| looking uh yeah yeah and mirrored. Yep. You can see the driveway here is off to the West. | 00:06:44 | |
| OK, let me see. I'm leaving the 4th car garage. Is that whole thing being taken out or is it just being correct? So yeah, they're | 00:06:54 | |
| taking that whole section out and then we're just doing the separate garage and got you instead of that. | 00:07:00 | |
| Umm, so you can see that there's a few things, few comments here. This is where that, uh, door will be. | 00:07:08 | |
| Actually, I take that back, so that's right here. | 00:07:16 | |
| Umm, let me go to these elevations of the thought we had a color board here. | 00:07:20 | |
| I'm not seeing color board, but anyways, uh, we, we did ask to do a little bit, umm, umm, higher end. Uh, I don't know if that's a | 00:07:29 | |
| higher end, but they're going to do a brick facade around the whole building. Umm, instead of the traditional kind of the front | 00:07:36 | |
| where they do, uh, an isoside there and the rest is off stucco. Umm, this will be all break and it'll look really nice. Umm. | 00:07:43 | |
| But yeah, that's, I mean, it's a house, right? | 00:07:53 | |
| It's a big drug, yeah. And we, we, we aren't seeking any kind of approval or anything like this. This will go through the Planning | 00:07:57 | |
| Commission with a more complete application the Planning Commission will review. | 00:08:02 | |
| The rest of the elevations overview, landscaping, umm, we'll make sure that it that it makes our code. | 00:08:07 | |
| OK. And then? | 00:08:15 | |
| Are they having a think about course for the pilot person to learn how to play pickleball? So Lauren, I'm sorry, we'll, we'll put | 00:08:17 | |
| it on the roof. | 00:08:21 | |
| Perfect. Now I think, uh, I don't have any questions. Does anyone here have any questions, uh, signing? No, we'll, we'll address | 00:08:27 | |
| most of our questions in finance Commission meeting next week or two weeks. Uh, and then after as long as the garage, I don't see | 00:08:34 | |
| any plans for the garage. Let me pull up the application and see if they have updated it just that. | 00:08:42 | |
| In one case, there's going to be two units above the garage. Is that correct? | 00:08:52 | |
| Umm, I'd have to. Are you living in unit? This is actually I think it's updated. It just says on the first page of the packet page | 00:08:58 | |
| it says 2 uh, 2 units about the garage. | 00:09:04 | |
| That's right. I, I don't think they have apnea. Do you know, have you seen the elevation for the garage yet? I, I think they're | 00:09:14 | |
| still working on sending all that material. | 00:09:19 | |
| At the back of the garage. So you're probably talking about like the units above, like yeah, you're talking about the detached | 00:09:26 | |
| garage, right then, correct? Yeah, information mentioned something about unit above the garage. | 00:09:35 | |
| Yeah. Good, good question. Yeah, we can look into that with the size of the apparatus and I don't think we could. | 00:09:44 | |
| Something in there without going. It's like a two-story facility. | 00:09:49 | |
| But I apologize, I forgot to introduce this. Umm chief, first time hearing has a lot of information about. | 00:09:53 | |
| Yeah, side by side. OK, so let's see, you know, this is a clarification cache if it's two units like to, uh, umm, you know, 2 | 00:10:00 | |
| vehicle units and we just had clarification on the terminology to say OK, yeah, this is all why I was familiar with in the | 00:10:08 | |
| northeast corner, they have that restroom. Yeah, no, that's a, that's a good couch. That's pretty much and, uh, Patricia. So yeah | 00:10:15 | |
| we'll, we'll check on that when. | 00:10:23 | |
| When we get the rest of the the materials for the detached garage. Alright, cool. | 00:10:30 | |
| Yeah. | 00:10:38 | |
| OK. So Eric, do you have any other questions? No questions there. And then Chris building? | 00:10:41 | |
| No question. Uh, no from the fire department. No questions. All right. And then, Yep. Uh, so, uh, do we have anything from, uh, | 00:10:49 | |
| you, uh, Patrick, excuse me. I know we have some technical stuff, but uh, yeah, that'll come later and review, but yeah, nothing | 00:10:55 | |
| really. | 00:11:01 | |
| Cool. And, uh, does anything. | 00:11:08 | |
| OK. And then on the site plan review and I think we need to. | 00:11:44 | |
| I think I have a meeting with Michael and and saying for this one of the Wednesdays that they're here, we can watch it out right | 00:12:27 | |
| back. Yeah. | 00:12:32 | |
| Are are we wanting them to take on the responsibility of doing all that work as well? Yeah, since we're since the city city | 00:12:37 | |
| project anymore. OK, Yeah, I'll talk to him. Yeah. See you next. | 00:12:43 | |
| Now, without being said, uh, that the closest, uh, that particular work session item and we have three other items, uh, you | 00:12:53 | |
| thought that you bought. | 00:12:56 | |
| And the developer representative not here, but I believe we have someone who wants to talk about the Bella's market pipeline or | 00:13:02 | |
| yeah so and and we do have Rachel online she's done the initial review on 13 C, but it shows that they it was an incomplete | 00:13:09 | |
| application. They are missing quite a few items a lot of items. So and so that one we're we're not gonna be able to get the | 00:13:16 | |
| Planning Commission on the 7th. I know they're hanging for that one but the. | 00:13:23 | |
| The grocery store blocked 4 Bells Market. That one is looking quite a bit better. And so we can still do a brief overview of that. | 00:13:31 | |
| And if there's anything that the DRC sees that may hold this up, then we probably won't push for it to get to the Planning | 00:13:37 | |
| Commission on the 7th. Otherwise we still might try to keep that on the agenda for the 7th for approval. So let me we'll get it | 00:13:43 | |
| over to Anthony here in a second. | 00:13:49 | |
| All right, so just as cash shared earlier, the grocery store is also missing a, you know, a few companies that need to be. | 00:14:03 | |
| Included to make it a very complete application. | 00:14:22 | |
| And I have some comments here that I can share. | 00:14:27 | |
| So the commentary sharing is going to be the components are missing. Can I get it to complete the application? Yes. | 00:14:32 | |
| Name. | 00:14:40 | |
| I guess my question is if it's not a complete application to even go towards Planning Commission. So they still do have a week | 00:14:42 | |
| until we have to get the umm, all the apples and make application materials ready for the agenda. This application did have most | 00:14:50 | |
| of the files. So like the other blocks we're reviewing, they have issues with planning. They can submit landscaping plans, their | 00:14:57 | |
| elevations are off, There's some issues, legal issues with the pedestrian bridge that goes between buildings. This one did have. | 00:15:04 | |
| Cool idea, but you know, there's some issues, maybe some legal issues that need to be worked out, some planning issues. So that's | 00:15:42 | |
| gonna bridge, uh, bridge building building yeah that that goes over public street. So yeah, that's fine. OK, so that that's kind | 00:15:47 | |
| of the idea with these work sessions is just to, to flag these, these issues before it gets to the Planning Commission process. | 00:15:53 | |
| Alright, that's fine. So. | 00:15:58 | |
| So yeah, we can, you know, just spend a few minutes looking at the grocery store and if there's any, you know, anything that jumps | 00:16:05 | |
| out or anything that, uh, anybody here might have concern with, we can send back and, and, you know, let the developers assess. | 00:16:12 | |
| Take it away, Mr. Anthony. | 00:16:24 | |
| Do we have anything open? | 00:16:53 | |
| I can, I can probably. Or you just gotta make sure it sounds important. Yeah, OK. | 00:17:29 | |
| That might schedule. | 00:17:35 | |
| Can you hear me now? | 00:17:39 | |
| So, umm. | 00:17:42 | |
| Yeah. | 00:17:50 | |
| Oh, can you hear me now? OK, so. | 00:17:59 | |
| All right, so lately we've been having issues with title reports and umm. | 00:18:14 | |
| Umm, you know, tax issues. So it's one of the main comments for them to make sure they're supplying us with umm, kind of data. | 00:18:26 | |
| Title report. I know it's not the most relevant thing to us here at DRC, but I thought I'd keep it in as part of my notes. Umm, so | 00:18:33 | |
| they would need to give us that, that information to be able to move forward. | 00:18:40 | |
| Now on landscaping, we have. I'll start with landscaping. | 00:18:51 | |
| Hello. | 00:19:01 | |
| Yeah. | 00:19:02 | |
| OK. | 00:19:14 | |
| So on the landscaping plan, they. | 00:19:24 | |
| Were missing quite a few things that I think should be made prior to the entire team just because they showed that. | 00:19:29 | |
| The rest of the whole block, so the block has not been subdivided to show the other projects. Uh, this is gonna be the grocery | 00:19:38 | |
| store with its parking right here now. Umm, we had. | 00:19:45 | |
| A discussion with Bronson, the applicant, and he just mentioned that the rest of the lot will be used by surface parking in the | 00:19:54 | |
| meantime until, umm, the, you know, until they're ready to develop these two buildings. However, the plan, uh, does not show that | 00:20:03 | |
| at all. It just shows the future. Everything developed with the, with the trees and everything. So I have a comment in there too. | 00:20:13 | |
| At least indicate that it's going to be UMM having service parking with UMM. | 00:20:23 | |
| You know, the landscaping meeting our requirements, at least for the service market in here. However, what is required and has | 00:20:31 | |
| been noted here for the parking for the grocery store is umm, one that meets code. | 00:20:38 | |
| So I have no issues with. | 00:20:47 | |
| I have no issues with this one, Anthony, real quick deal with the other building, you know, footprints being service parking. Are | 00:20:51 | |
| they planning on implementing that with this site plan or is this gonna be part of one of the other block site plans? I know | 00:20:57 | |
| they've been allocating parking for blocks on different blocks. So the, the last time we spoke about it, Bronson had mentioned | 00:21:03 | |
| that you're trying to implement it with the site plan here for umm, uh, the grocery store. So I wanted to be indicated at least | 00:21:09 | |
| also, uh, explained in the narrative. | 00:21:15 | |
| Is that they are planning to have digital service parking in the meantime until further notice. And umm, it would not change the | 00:21:21 | |
| parking count. Currently the parking count just needs what is required. Umm, so does the umm, ADA as well, maybe itself. So yeah, | 00:21:27 | |
| if, if they are planning on doing that, which which is great, they would, we just want to see an updated site plan that shows the | 00:21:34 | |
| entire, you know, parking. | 00:21:41 | |
| Umm, parking lot and not the building footprints because that doesn't help with a whole lot. | 00:21:49 | |
| Yep, Yep. So I have it in here as part of the, the umm, comments for them. Umm, that's the main thing. And if they're doing the | 00:21:54 | |
| parking lot as well, we just don't wanna see a, a concrete or asphalt. We just wanna make sure that we have umm landscaping along | 00:22:02 | |
| it because we don't know how how long that parking lot is gonna be in there for. It could be 5-10. | 00:22:11 | |
| And, and on the technical side, I mean, we, we're the engineering. So we need to see the parking lot forward and so forth. | 00:22:20 | |
| This is supposed to happen. | 00:22:28 | |
| I don't know. And then of course any kind of other. | 00:22:31 | |
| Uh, utilities, that might be enough in those areas. I guess they'll be temporary, temporary, uh, locations until the, uh, and so | 00:22:36 | |
| forth. | 00:22:40 | |
| And then you know that could be part of the long term management plan is going to have to address that, you know the temporary | 00:22:45 | |
| structures being separated until a permit. | 00:22:50 | |
| So. | 00:22:58 | |
| Thank you. | 00:22:59 | |
| I don't think I'll need to review the pipeline system. | 00:23:02 | |
| Have you reviewed at the technical sign in control? Right, OK. | 00:23:05 | |
| I'll make I'll make a note of it just to give them heads up on that as they update this one. | 00:23:08 | |
| Umm, those null irrigation plan provided. So that's, uh, something that we request for. It was actually now, umm. | 00:23:14 | |
| Scope of work that gave a real description of what they're intending to do on the actual site. They have shared with us, uh, not | 00:23:24 | |
| written though that, uh, they intend to not plat because we had issues with planning on other sites that have been submitted. But | 00:23:31 | |
| with this one, they decided to just keep it open just because if you look at this one, it's one open big, you know, block parcel | 00:23:37 | |
| right now. | 00:23:44 | |
| But umm, once they build out here, that's why they have, you know, plans of making this. | 00:23:51 | |
| Parking lot because once they've done out here and they're not ready to develop these ones, uh, they don't want to spend time and | 00:23:57 | |
| money and also tax for tax reasons. They don't want to subdivide this and uh, you know, give them issues in the future. I've | 00:24:04 | |
| requested that they have all this in writing in their narrative or scope of work, just so that we're all on the same page and we | 00:24:12 | |
| don't just assume that they're going to, you know, get things done as it should be. | 00:24:19 | |
| So that's what we're landscaping. One, one other thing with landscaping, Anthony. I know that at the West side of the grocery | 00:24:27 | |
| store, you have that that building back there. I know that's gonna be a separate building from my understanding. | 00:24:33 | |
| Are just note down just right by the semi day to the West of that the left of that that whole section I I believe they're planning | 00:24:41 | |
| on building separately. Umm and so we need to know you know that's not gonna be built with this grocery store. What what's it | 00:24:47 | |
| gonna is it gonna be landscape? Is it gonna be asphalt You know so I asked for that as well in the narrative and an updated site | 00:24:53 | |
| plan that that shows that. | 00:24:59 | |
| Yeah, yeah. | 00:25:12 | |
| What are the other two buildings? | 00:25:22 | |
| Uh, there's no plans for them yet. What they will be umm, I think the area is zoned that it, it could be retail, it could be | 00:25:25 | |
| office, it could be residential. Umm, I believe it will have some sort of retail component on the ground floor, but. | 00:25:33 | |
| Until we actually see plans from them, we don't know. Yeah. | 00:25:41 | |
| They expressed, uh, with last time I asked the same question, they're like, they're actually thinking of having some sort of a | 00:25:45 | |
| mixed-use in there with ground floor retail and, uh, residential and offices, you know, above it. So yeah, it just brings up a | 00:25:52 | |
| good point. There are those like little smaller buildings that they're building up to the north of the grocery store. Are they, is | 00:25:58 | |
| that being built with this phase? I have no idea. It needs to be specified. | 00:26:05 | |
| OK. | 00:26:13 | |
| I mean, the next door is. | 00:26:16 | |
| Is this just similar to your? | 00:26:26 | |
| The structures on the north side of the building. | 00:26:32 | |
| Residences, yeah. So the drug response will be a lower elevation than the surrounding. I think that West and north side will be 4 | 00:26:35 | |
| or 5 million. The elevation that I'm looking at shows the potential outline of like an 8 story building, but it's not an official | 00:26:43 | |
| thing. I can I can show the elevation, OK. | 00:26:51 | |
| And you can see what I'm talking about here. | 00:27:00 | |
| Yeah. | 00:27:04 | |
| I'll just take a minute to load here. | 00:27:06 | |
| Quite too far. | 00:27:09 | |
| So there is the front elevation of the grocery store. | 00:27:12 | |
| You can see that this is what I was talking about there this other building over here. | 00:27:19 | |
| After that I just left the West. | 00:27:25 | |
| Halfway 9. | 00:27:31 | |
| I don't know it's going to be that tall, but yeah, I, I mean, until we get site plans from them, you know, things can change. It | 00:27:35 | |
| could be one story could do it could be a, you know, just landscaping for the foreseeable future, every single family houses. | 00:27:43 | |
| Hi, it's cannot. I don't think our company would allow that. So but they are planning on separating those with the firewall so | 00:27:52 | |
| they can open the grocery store. | 00:27:56 | |
| So, uh, one, one thing I did want to ask Anthony, have you looked much into the code on the drive through? Because I know they | 00:28:02 | |
| have the pharmacy on the South side with the drive through, not into detail as it relates to the umm, uh, downtown side. So, OK, | 00:28:09 | |
| that, that might be something that could hold this up. Umm, if, if we can't figure out how to make that work unless we have to go | 00:28:15 | |
| through it. I mean, text amendment to allow for pharmaceutical. | 00:28:21 | |
| Uh, Dr. Throughs because I think our code right now specifically called out like hotel drop off. | 00:28:28 | |
| Umm but not other Dr. throughs so. | 00:28:34 | |
| Yeah. | 00:28:41 | |
| And this is that firewall on the West elevation it looks like. | 00:28:45 | |
| Was there anything else we wanted to review on this one, Anthony? | 00:28:57 | |
| Quick one, can you pull out my comments again? | 00:29:01 | |
| Any information about the bridge? | 00:29:05 | |
| The pedestrian Ridge. So we, we didn't, I mean, that's on a different block, but umm, essentially we went with Jamie, our attorney | 00:29:09 | |
| on that to talk about what needs to happen to allow for that. Umm, And so one of the things we're gonna have to figure out is, is | 00:29:16 | |
| planning issues. How do we flat a bridge going over a public St. And so it might end up being that they retain ownership of that | 00:29:22 | |
| section of St. umm, and it's private. | 00:29:29 | |
| Umm And then the other thing that that they are the the applicant is, is examining our code to see if we even allow them, umm, and | 00:29:37 | |
| what they're wanting to do with it. | 00:29:41 | |
| And it's not, it might also require zoning text amendment. That's kind of another reason why that one's been pushed back. Yeah. | 00:29:46 | |
| When you have the, uh, for the discussion, excuse me, just to get the password part of that discussion. Yeah. Wait for a moment. | 00:29:53 | |
| Umm, Minneap, Minneapolis, MN. So skybridge is quite a bit, not just, uh, throughout the whole, throughout the whole city. So, | 00:29:59 | |
| yeah, it's an easy. | 00:30:06 | |
| Umm, easy model to look and look at and you know, and it's a whole system connection building, building as an office place. Thank | 00:30:14 | |
| you. | 00:30:18 | |
| Doesn't people from there says they're tough but they like to go sprinkles up there? | 00:30:23 | |
| We we met with umm Janine last week. Were you on the podcast? Yeah, yeah, I was just telling the same kind of explain the process | 00:30:32 | |
| of which they'll need to go through. But essentially we're we're leaving it up to the applicant to figure out the. | 00:30:38 | |
| Legal way of doing this and making sure it's, it's in our code, yeah. | 00:30:45 | |
| Senior conversations may be directed to. | 00:30:53 | |
| The Minneapolis, Minneapolis, Minneapolis example and yeah, I, I mean that they're, they're aware of a lot of different, uh, sky | 00:30:56 | |
| bridges and stuff like that, but it's more specific to our downtown code. Does that allow for this? The, the other thing with the | 00:31:03 | |
| skybridge is they have this arcade style, umm, entrance to the building, which means they have units, essentially residential | 00:31:10 | |
| units that are built on top of the sidewalk. And so that's another issue that we're trying to, to figure out. | 00:31:17 | |
| I can show you not a few more. Alright, let's finish up. Is there anything else at the grocery store and then I can show the one | 00:31:27 | |
| of the things we need clarity on would be materials on the elevations. Like they need to specify a lot more on the elevations and | 00:31:32 | |
| umm also. | 00:31:37 | |
| That drive through brought up. So that's that's about it for the drive, uh, for the. | 00:31:43 | |
| Uh, grocery store. I don't know if they're really ready for five, umm, Planning Commission, but may maybe we could do a work | 00:31:49 | |
| session on the 7th if it's not ready. Yeah, sure. | 00:31:54 | |
| Let me see real quick if we wanna quickly just talk about this. | 00:32:03 | |
| Umm, skybridge in these arcade. | 00:32:08 | |
| Entrances if my computer loaded in. | 00:32:14 | |
| Sorry these files take a minute for. | 00:33:26 | |
| I may have froze my computer. | 00:33:38 | |
| OK. I think we're back in business here. | 00:34:02 | |
| OK. | 00:34:10 | |
| As the elevation. | 00:34:30 | |
| For the first four. | 00:34:38 | |
| OK, let's see if this shows the and it's. | 00:34:41 | |
| Yeah, so you can see this is a good example of it. This is on block 18. Umm, the red here is their uh, building line here outside | 00:34:46 | |
| of that's gonna be your side walking street and you can see these units encroach that. | 00:34:53 | |
| I can see if I can show you the elevation so you can kind of get an idea of, I mean that's not part of the site plan approval. | 00:35:07 | |
| That that's part of AT&T is what they're, which is on their 13C and AT&T we, I put them as one item on this agenda just because | 00:35:13 | |
| these buildings are pretty interconnected. So we're not talking about that. | 00:35:18 | |
| OK, that's correct. Yeah. I just, you were asking about the Cybridge and I said that's one problem, this is another problem with | 00:35:26 | |
| them putting essentially these residential units directly over the sidewalk. | 00:35:31 | |
| Elevated, right? Yeah. So this is what we're looking at right here is the third floor. So essentially they have these, umm, I | 00:35:39 | |
| don't know when, yeah these pillars that hold up the first two floors or going from the first two floors up to the third floor. | 00:35:45 | |
| And then from there they have, you know, a unit here, I think the unit on the 1st, 4th floor and on the 5th floor they have like | 00:35:52 | |
| an amenity space. | 00:35:58 | |
| Umm, that that people can utilize. | 00:36:05 | |
| So that was just another problem that relates to the skybridge, seeing the details on that. So cool. Thanks. | 00:36:10 | |
| Was there anything else on the uh, we want to talk about the one, uh, the one pipeline work session being the, uh, Block 4? | 00:36:21 | |
| No, no, I don't think so. We'll we'll probably do a work session on that Planning Commission, but. | 00:36:30 | |
| I don't think so. | 00:36:37 | |
| No, Patrick, did you have anything on that one? | 00:36:41 | |
| OK, cool. Uh, let me know if I have questions. Uh, let me start from over to order this time, uh, Brian. | 00:36:45 | |
| No questions. | 00:36:53 | |
| Building no questions, none. Thanks. | 00:36:57 | |
| No. Uh-huh. | 00:37:03 | |
| I'll I'll back up on my end asset, uh, for next week. Uh, OK. | 00:37:07 | |
| Sent out, umm, no, nothing said uh, I'll uh, close this work session, uh, and then moving on to #4 staff permissions may report. | 00:37:12 | |
| Do you have anything, uh, Anthony, is there anything on that one? Umm, so we have umm, the RSP for the tax branch that we received | 00:37:20 | |
| 129,000 to umm, redesign the umm. | 00:37:28 | |
| The Mill Rd. Cornwall and also get a well citywide wayfinding master plan and so that RFP is complete and will be going out today. | 00:37:38 | |
| Sure. Thank you very much. Good job with the work on that. Yeah, Yeah, Patrick, Sir. | 00:37:49 | |
| Uh, I don't know if I have anything right now. OK, alright, anything from the group? | 00:37:58 | |
| So do I have a motion for adjournment? 11 more would be never mind. Sure. So, umm, we, we will be need, we will be, we have been | 00:38:06 | |
| actually invited to the, uh, the county Commission meeting to get the approval for the TRCC grant extension. We requested for a 24 | 00:38:15 | |
| month extension and uh, they have worked with us and now we will have that approval on the 31st of this month. | 00:38:24 | |
| And you're all invited to the meeting, uh, of accounting. | 00:38:34 | |
| We'll have the 24 four months starting from the day of approval and would also have the inflationary asks that we requested that | 00:38:37 | |
| relates to the amount region inflation. OK. And then, uh, so and the other. | 00:38:45 | |
| We're invited, Yeah. I think that would be great to obtain for, uh, Patrick to understand. | 00:38:57 | |
| You're welcome, Sir. Yeah. So make sure you don't leave them behind like, uh, you did for the last time. I thought it was | 00:39:02 | |
| happening. | 00:39:05 | |
| We'll make sure he's with us. I appreciate that. Thank you very much. Alright. Well, that being said, there's nothing else. You. | 00:39:10 | |
| You can just adjourn it. Alright. I'm sorry. Hang on. Thank you. Have a great day. | 00:39:15 | |
| OK. | 00:39:27 |