But we're gonna start our DRC meeting. It is. 00:00:05
9:00 on May 1st, 2025. 00:00:14
OK, there's no. 00:00:24
Does anybody have to have a Commission report? 00:00:25
No. So we just need approval of our consent items. 3.1 Approval of the January 16th, 2025 Development Review Committee meeting 00:00:28
minutes. 00:00:32
And 3.2. 00:00:36
Approval of the February 20th, 2025 Development Review Committee minutes. 00:00:38
Motion to approve UH consent items 3.13.2. 00:00:43
Uh, first buy Morgan. 00:00:47
2nd. 00:00:48
Second by Eric. 00:00:49
Oh, something all in favor. 00:00:52
All in favor. 00:00:55
Hi. Hi. How are you? 00:00:56
All right, business items, our first business and last from 4.1 you custody. 00:00:59
So the platinum amendment from the. 00:01:03
Satin with BlackBerry is requesting approval of the Etacity Phase 3 Platt amendment. 00:01:05
Alright, I can introduce this item that can be reloading here real quick. 00:01:12
OK. Phase three consists of 10 locks and two partials located uh within custody. Development is originally approved May of last 00:01:15
year. 00:01:19
Umm, this amendment will fix some addressing issues. 00:01:24
Space arrow and putting encroachments and include language that all private roads shall be available for public east of our time. 00:01:26
Pop the part here. 00:01:32
Umm, so you can see this might look familiar. Umm, it has been, uh, recorded. But we are. 00:01:34
You know, requesting an amendment here. 00:01:39
Umm, like the the addresses? 00:01:41
And then you can see those. 00:01:44
Right away encroachments right here. 00:01:45
Right along block 13 C. 00:01:47
Umm. 00:01:50
The one request that we did have in in my understanding that they might already have. 00:01:51
Have a new plat on on the way. 00:01:56
Was just to fix the the hash mark. You'll see the the slope easement. 00:01:58
The PUE and MUE. 00:02:02
And even part of the right away encroachment I'll have this diagonal patching. 00:02:04
Umm, that all looks fairly similar. 00:02:08
Uh, the legend over here. 00:02:10
Just kind of shows aerial encroachment. 00:02:12
I just wanted to. 00:02:14
Clar clarify that. 00:02:15
Umm, I mean, I know what what? 00:02:16
It's supposed to be, but. 00:02:19
Uh, just for future use, it'd be helpful. 00:02:20
You know, it was a different symbol or something like that. 00:02:23
So that that's really the only comment from planning. Everything else looks great. 00:02:25
Oh so I have a comment. Umm but. 00:02:30
Uh, uh, Patrick, was there anything else for you? 00:02:33
Uh, my comment is regards to the dedication to the road. 00:02:35
Umm, I thought we had moved towards us. 00:02:39
The public roads. 00:02:42
Uh, from. 00:02:43
I haven't done a rough decade because I know that there's a path in the process. 00:02:45
Further occur. 00:02:49
Sir, can you hear me? Yeah. 00:02:57
Umm, I think. 00:02:58
I think that is the case. 00:02:59
Like on on Main Street and Avery. 00:03:01
And we'll come back in and do roadway dedication slab. 00:03:04
As the building. 00:03:07
Uh, the building tabs get further along. 00:03:09
So it's like 14 D and 8A. 00:03:12
Those will be the first two buildings in this plat. 00:03:14
That will will be opening. 00:03:17
We're probably. 00:03:20
What BJ like 8 months? 00:03:21
Out on 14 D opening. 00:03:24
CFO. 00:03:25
For 12 months. 00:03:27
So. 00:03:30
Somewhere, sometime around there before occupancy happens, I think we'll come back in with us. 00:03:30
A roadway dedication plan, but. 00:03:36
There's so much work going on here. 00:03:37
Umm, I think that's the reason why they're. 00:03:40
All gonna record initially as private and then we'll do roadway dedication classes. The buildings get closer to definition. 00:03:42
Umm Bronson, Ontario, obviously that City Hall site or vineyards hire site on the West side where we have a. 00:03:49
Agree that that's EU dot easement. 00:03:55
Uh-huh. 00:03:58
So where we have the parking structure that's gonna essentially align that, is there an opportunity? 00:03:59
You know from you dot to potentially put in like a road or something. 00:04:04
Behind it. 00:04:08
For access to like the the mag. 00:04:10
Warehouse. 00:04:12
Because we have like the courtyard. 00:04:14
Concept that's gonna separate parking structures from City Hall. 00:04:16
Is there a way to get access? 00:04:19
On that, would they allow something like that? They said they would allow like a frontage Rd. 00:04:21
As long as it's on our property like. 00:04:26
We've talked about it as a deceleration lane. 00:04:28
It would be in the easement, yeah. 00:04:32
Oh man, that. 00:04:34
Yeah. 00:04:36
As long as it's outside of EU dot right away and the slope easement is out in the. 00:04:37
And right away. 00:04:41
I mean, that was just. 00:04:42
Really high level discussions and. 00:04:43
I think we could totally use your guys help and. 00:04:46
Continuous conversation we have. We have a pre op meeting with Oh I see. You know when I say we, the city has a pre op meeting 00:04:48
with the dot on May 14th. I'm on the 2nd or 13th. 00:04:53
Uh, is that something we can put on? 00:04:58
Or if you know. 00:05:00
And the the the signing of the winners. 00:05:01
Center, uh, facility as well. And then the question onto the. 00:05:04
Great honor. So that is the topic too for discussion. What we have like Bronson or any of his crew on that or is that just the 00:05:09
city meeting that has to be in UMM? 00:05:13
Do you? OK, So it might be worth having a are they are they wanting that? 00:05:18
Umm, just, well, I'm sorry, no City VOC and Memphis Studio. 00:05:21
Yeah. I mean, we, we could, we could probably set a different meeting so you guys can help. OK, we're gonna do that on and then 00:05:27
come back. 00:05:30
Typically when it comes to the dot and questions on those business so. 00:05:32
So, uh, we're a customer. Talk about ease easement, uh. 00:05:37
The sorry umm, the. 00:05:41
There is a uh. 00:05:45
Have a blanket space agreement, uh, in regards to. 00:05:46
Uh, municipalities utilizing slow business. 00:05:50
Uh, for the purposes of. 00:05:53
Public. 00:05:55
Uh, good. 00:05:56
And yeah, for the public good. 00:05:58
Uh, and they can't be non permanent structures. 00:06:00
The hot spells though, it does a Rd. 00:06:03
Could be OK. 00:06:05
As long as it's not a private. 00:06:07
It seems like for a fire accident, yeah, I mean. 00:06:09
There's, there's, there's that that gets you on the north side of the building and then. 00:06:13
Keeps kind of the, umm, integrity of the courtyard design in place. 00:06:16
Yeah, the biggest part of the thing, and I know that. 00:06:21
Uh, and we can have the. I would prefer the discussion offline. 00:06:24
There's the biggest point about it, Uh. 00:06:27
Uh, the amount of encroachment and if. 00:06:30
Uh, because the last discussion was about. 00:06:33
Uh, the the. 00:06:35
Possibility of needing to retain retaining walls in order to utilize that for roads. 00:06:38
Improve improvement. 00:06:43
And that'll be where the. 00:06:44
Uh, maybe. OK, we'll have to. 00:06:45
Because I did a lot more. 00:06:47
OK on that. But again that's. 00:06:49
I think that's outside of this. 00:06:50
Participant Topic. 00:06:51
Uh, discussion, but. 00:06:53
No. 00:06:54
Use my language to on the. 00:06:56
On the sale of the easement. 00:06:59
So yeah, very happy. 00:07:01
I think so. And then, uh, but yeah, we're gonna have, I think it'll be beneficial to do the. 00:07:02
Initial discussion. 00:07:07
The developer and then before now. 00:07:09
I think as long as we kinda go. 00:07:12
Forward together, like unified on that idea. 00:07:14
Like a deceleration lane that gets access into. 00:07:17
Into the streets, into the. 00:07:20
Parking structures. 00:07:22
Oh, I'm sorry. 00:07:23
More maybe, Maybe I'm misinterpreted. Was it was your discussion about? 00:07:26
I wouldn't understand. I mean, that's not bad. So Ma, maybe that's part of the conversation too. 00:07:29
That's why we talked to them about. 00:07:35
Or EU dot meaning then so where we have an alignment. 00:07:37
But So what I was talking about? 00:07:40
For you. You too, guys. 00:07:42
Yeah, the architect. 00:07:45
You got 4 cards here. 00:07:47
If they are going to. 00:07:49
Without having to. 00:07:56
Sideways. That'd be great. 00:07:58
That's one of the ideas that was pretty impacted from. 00:07:59
Oh, I see. 00:08:03
To the warehouse. 00:08:05
Format, I like that too because potentially provided like another umm spot for fire access to today's before we are pushing in a 00:08:07
little bit, we've enhanced it or something like that. 00:08:11
But if the idea is to do a deceleration. 00:08:18
Yeah. And you can turn right off. It'd be like a right in, right out. 00:08:21
Scenario. 00:08:24
Yeah. So anyway that that's what I was. 00:08:25
OK. 00:08:28
To come from the north, down and around. 00:08:30
Yeah. 00:08:32
There's conversation, yeah. 00:08:34
O One thing that I have to point out to me there's, there's still might be some, uh, addressing issues on here. I just pointed out 00:08:38
with, uh, partial E&D, they're still both labeled 1000 N. 00:08:43
Umm, and they are. 00:08:48
Should be closer to. 00:08:50
Umm 83850. 00:08:52
More, umm, so there's other conditional approval. Uh, it could be something like that. 00:08:54
The applicant works without addressing issues with engineering prior to recommendation. 00:08:58
OK. 00:09:02
I think for the. 00:09:06
You know is. 00:09:08
Did you guys settle in on that Vineyard Center footprint? 00:09:09
We'll probably bring another platinum that subdivides 10A. 00:09:12
Yeah, 10 AM. 00:09:15
Mm-hmm. And I think, uh, also part of this, umm. 00:09:16
In regards umm. 00:09:20
Coming before the response, I think, umm, it would be. 00:09:21
Doing as well as a. 00:09:25
Umm, memorializing and agree with agreement in terms of how they're right away going to, uh, be. 00:09:26
Turned over that. 00:09:33
Uh, to the city, uh, for future. 00:09:34
We can kind of, uh, outline like. 00:09:36
Umm, we're gonna find the, uh, expense and so forth and the, and, uh. 00:09:39
And put down. 00:09:44
When I say timelines off timeline in terms of uh. 00:09:45
You know, umm. 00:09:48
Completion into those certain blocks and such. 00:09:49
Uh, the primary reason for that, and I think, uh. 00:09:51
More on uh, you know. 00:09:54
The PRC happened to how my operations have is. 00:09:56
Uh, and do you know when you'll be taking them over? Well, especially when you're taking over with, uh, resource planning and so 00:09:59
forth, Be like, uh. 00:10:02
Patrick, myself and some others has uh. 00:10:06
Spend all time developing uh. 00:10:09
Long range uh. 00:10:10
Payments. 00:10:12
Payment plans and funding sources and so forth So. 00:10:14
With that, uh, we can have something that's more codified. 00:10:17
For the justification to. 00:10:21
Umm, why we're why we're including certain aspects into. 00:10:23
OK, then no, Yeah, the normal public requires there. Why are you including some of those privacy? 00:10:27
Uh, when they're, when they may be looking on. 00:10:32
Uh, it's not. It's not. 00:10:35
Account as part of our plan. 00:10:37
Bye bye, I'll probably help that would that would help with the justification for. 00:10:39
So I think that we could turn over, I think in space right now and. 00:10:45
I can't remember what's in the notes. 00:10:48
Maybe zoom into those notes. I think there's just. 00:10:51
Two or three notes there underneath that easement hatches. 00:10:53
Interest is in accordance. I didn't know if I'd go over to the. 00:10:57
So you have the one paragraph there. 00:11:01
You're talking about this paragraph. 00:11:03
No, that paragraph's just about the uh oh. Yeah, it's available. 00:11:06
For public use, yeah. Just let's get a little clarification if I. 00:11:11
Like, maybe you're really familiar with this? I've run out. 00:11:16
Are we talking about? 00:11:19
Where we have condos or residential space. 00:11:20
Above. 00:11:23
Public right of way. 00:11:23
No, uh. 00:11:25
Nesting was talking about, I'm talking about when will the road. 00:11:26
OK, so does does this plot contain any of those areas where there? 00:11:29
Yeah. 00:11:33
Has do we have something from Jamie that says we, we, we can do that? Because I, I, I wouldn't wanna approve this plot. If you 00:11:34
haven't worked that out, it's in the owner's dedication setting up on the next page. 00:11:39
Or let's see. 00:11:45
Yeah. 00:11:47
Zoom in there. 00:11:48
And it talks about the easements in this. 00:11:49
So Anthony or Cash, do you have something from Jamie? From, from my understanding, Jamie has been working with their legal team on 00:11:52
the language for this. 00:11:57
Umm, he will also be 1 to find this. 00:12:02
So. 00:12:05
We can make sure in the end I've I've reached out to multiple times. 00:12:05
On it and just have not. 00:12:09
Burning the. 00:12:10
This and the other part we've waited. 00:12:11
How how do we work? How, how how do we approve something like like that's? 00:12:13
So you have a pretty major thing. This doesn't work out. I don't, I don't think we're in a spot where we we can approve a plot. 00:12:17
It, it, I mean, is it residential? And it's a, uh, it's a bridge. 00:12:23
Uh, this one doesn't have the bridge. 00:12:27
But right there is. 00:12:29
Uh, zoom back in there. 00:12:30
Kind of right in the middle, it says. 00:12:32
The undersigned owners reserve. 00:12:33
To itself themselves. 00:12:35
Perpetual airspace easement. 00:12:36
Including easements for support of. 00:12:38
An encouragement within the above dedicated. 00:12:40
Public events. 00:12:43
That that line and then the next. 00:12:45
Like note 1 and Note 2 in there. 00:12:48
Those were. 00:12:50
Those were the. 00:12:52
That was the text that came from Wade. 00:12:53
That Jamie and Wade had. 00:12:55
Been talking about but. 00:12:57
From from the City side, I don't know. 00:12:59
What? 00:13:02
Jamie has approved. That's probably something you guys need to work with. Yeah, I, I. 00:13:03
Can you do like a? 00:13:09
Condition of approval that. 00:13:10
That's worked out. Any red lines or? 00:13:12
Address What if if we could umm. 00:13:14
By share if we could maybe put this item. 00:13:17
At least umm on on hold in this meeting. 00:13:19
And then we can move to the other item. The other item is about the same issue. You're saying, umm, yeah, so. 00:13:23
What's the third one we got? 00:13:30
Orchard, Washington Orchards. 00:13:32
It's it's the bridges and the Res residential. 00:13:36
So this one is just the residential and then the platform has the bridge in it and the language is a little bit different to talk 00:13:39
about that bridge. 00:13:43
Mm-hmm. 00:13:48
What? What? 00:13:50
The the RJ I think it wasn't on my symptoms type of dentist type. But isn't it like a a bridge like a umm? 00:13:52
Average. 00:14:00
Yes, Skybridge has a skybridge that actually. 00:14:01
Goes completely across the street. 00:14:04
OK. On top three, it's. 00:14:06
Just encouragement into the right of way. 00:14:08
It goes vertically. 00:14:10
Right up the building. 00:14:11
Umm, if, if we could, I mean, I don't wanna, I don't wanna hold you guys up. I know you're on a tight time frame, but umm, I. 00:14:13
Personally don't feel comfortable until we get something from an attorney. 00:14:19
Eric's Eric's text name I don't know if maybe. 00:14:23
Cash or app if you wanna give Jamie a call and just. 00:14:25
Yes, I'm I'm sort of idea if if he approves. 00:14:28
A thumbs up on that. 00:14:32
But if not, then umm. 00:14:33
I would suggest that you continue it, uh, the other IOC reform issue, uh. 00:14:35
Another job. 00:14:39
Uh, Utah, uh, Utah State law, uh, does, uh. 00:14:41
Have it in there that umm. 00:14:44
The uh authority having jurisdiction in the Valley, umm, does preserve the right. 00:14:46
Uh, to uh, prohibit, uh. 00:14:52
Uh, anything that's. 00:14:55
Uh, goes over public right away. 00:14:56
That's what I'll be at the end of the danger. 00:14:58
Mm-hmm. Uh, so I just. 00:15:01
Take that, uh, like. 00:15:02
Uh, just thankful to say like. 00:15:04
1000 years now let's say like that that the. 00:15:06
Thy bridges or the overhang. 00:15:08
Call Dave Public Safety. 00:15:11
Let's say he does reserve the right to go in there and. 00:15:13
Either them download take it down. 00:15:15
Or, umm, make the necessary repairs? 00:15:17
Uh, without the ORS approval. 00:15:20
All right, Yeah. 00:15:22
And then if you can, go back to the plaque. 00:15:23
Just I I wanna see the umm, block four of the promenade really quick. 00:15:26
Because I, I, well, what I would like kinda, kinda in addition to this, and maybe this is something that we could tackle with a 00:15:30
future plot with the condition on this plot. 00:15:34
But. 00:15:37
I I think anything that's that's like a. 00:15:38
I I understand we worked out kind of the, the leasing. 00:15:41
Block 5 for the Aquatic Center. 00:15:44
But what we're putting restaurants and, and, and there's I know there's a couple spots that we talk about on the promenade. 00:15:47
I I don't know those are areas too that I would like. 00:15:53
Jamie to look at. 00:15:56
Because if we're. 00:15:57
Essentially a private use. 00:15:58
Within a What's gonna become a public park? 00:16:00
Do we do that? 00:16:03
Is that do we just break off that one piece? 00:16:05
As a, umm, as a private piece. 00:16:08
That still has like maybe a public easement through it. 00:16:11
Umm, I don't, I, I, I could just kind of foresee some of those. 00:16:14
Turning into. 00:16:17
Issues as far as the property ownership, what we allow within. 00:16:19
And I I would like to have those things kind of worked out or maybe the condition. 00:16:24
That a plat it's recorded with the proper easements and legal documentation. 00:16:28
Prior to any occupancy. 00:16:33
Sounds good on my suggestion that if if they do move forward with the commercial use here, we could go back and. 00:16:37
Do not work on that. Could you while while we're working on this? 00:16:41
Umm. 00:16:44
Portrait item could could you develop some language for for condition? 00:16:46
For the Comer, OK, yeah, but would that be right? Just contact with them? You want me to call Jamie or? 00:16:50
Uh, the information regarding the call now if you want to have. 00:16:57
OK. 00:17:01
Got it. 00:17:02
Yeah, thanks. I know there is a lease agreement to specifically on the resort pool for the restaurant with land. 00:17:04
Yeah. And that'll fall within that. 00:17:10
Lease agreement so I don't know if it needs to be handled. 00:17:12
From the platter of the lease agreement. 00:17:14
I I think I think that we have that one worked out. 00:17:17
I think, I think we're, we're fine with that. 00:17:19
It's more of umm. 00:17:21
Block 4 where umm, there's gonna be like a pop up in my commercial, which is great. I mean that's something I think it's gonna 00:17:23
activate. 00:17:26
Base, it's really wonderful, but. 00:17:30
I I wanna make sure just that. 00:17:32
Like what's the mechanism? Because like if it's. 00:17:33
I know, I know it's seven years, but to me that's that's permanent. So for having a permanent type of restaurant there, maybe it 00:17:37
goes away with something else comes in. 00:17:40
I just wanna make sure that we, uh, you know that. 00:17:44
Like from an ownership standpoint, is that is something that James OK with it being public? 00:17:47
With a restaurant on public. 00:17:52
Property. 00:17:53
Do we do it at least? 00:17:54
So do we just carve out in the middle as one of your parcels? 00:17:56
Yeah, I know. Yeah, Yeah. So if we could do that with condition, then I'm OK, then we can work that out before. 00:17:59
Data use comes in a place. 00:18:05
Yeah, sounds good. 00:18:07
Any other comments? 00:18:13
Uh, that that we're. 00:18:15
Pushing us further. 00:18:17
He's talking with Jamie right now, so why don't we go ahead and move? 00:18:20
If you're OK with the spice sheriff's item, umm. 00:18:23
4.3 And then we can we can work them out of that one. 00:18:26
So we're gonna move on to business setting. 00:18:29
4.3 Orchard Springs, Florida. 00:18:31
Are you on this one? Yes, I am. 00:18:35
OK, so umm. 00:18:38
Just to give your location context, we umm. 00:18:41
We'll be looking at a client application. 00:18:44
In the highlighted area. 00:18:47
Looking like uh. 00:18:49
The Utah map, almost. 00:18:50
Umm, wrapping around an open space and this area here is gonna be there. 00:18:53
Umm, pub house. 00:18:57
OK, so. 00:18:59
The density. 00:19:00
Umm for the proposed project. 00:19:02
The, I mean the zoning for the first project is the H. 00:19:04
The R2 which is high density or invention. 00:19:07
Uh, which allows for what the applicant is. 00:19:10
Uh, potentially looking to build in the area. It allows for medium and high density. It's gonna be townhomes. 00:19:14
Umm, in compliance with. 00:19:21
The applicable zoning density and. 00:19:22
So far. 00:19:25
Would handle the design standards in the future when they come in for a flight plan application. 00:19:26
Uh, the total area of the space is almost 3 acres. Umm is gonna be 10 buildings. 00:19:32
Uh, giving us 10, uh, 35. 00:19:38
Private unit. 00:19:40
And, uh, some common area to be used by. 00:19:41
Tenants or residents of the area. 00:19:44
Umm, The site is intended to promote workability, you know. 00:19:47
And with all this open space integration? 00:19:52
And efficient access to existing infrastructure. 00:19:55
In the area. 00:19:58
Further architectural features will be. 00:19:59
Addressed during umm. 00:20:02
A pipeline application when they get there on the building by the organizations. 00:20:04
So going straight to the application. 00:20:08
This is the plan. 00:20:12
Umm. 00:20:13
I just used this. 00:20:17
They need. 00:20:19
You know we, we. 00:20:20
Provided. Planning department provided. 00:20:21
Umm, all of the. 00:20:24
Comments that we. 00:20:26
Thought should be addressed and they addressed it accordingly. There was a little bit of back and forth. 00:20:28
But everything has been addressed, they meet all the requirements. 00:20:33
For umm. 00:20:36
What the plant is umm intended to? 00:20:39
And also what the county requires for this to be recorded. 00:20:42
So. 00:20:46
Umm staff. 00:20:47
Recommends the approval of. 00:20:48
The plaques as presented. 00:20:50
Does the engineering have, uh, any common? 00:20:54
No, no, no, no comment. 00:20:59
Umm. 00:21:03
This is Mara for me. Uh, more of a umm. 00:21:05
I don't know, like nuanced technicality type thing. 00:21:08
On the market spaces that are showing on here. 00:21:12
Uh, I do recognize that it's on a private road. 00:21:14
Umm, but but then there's, uh, areas that show common areas. 00:21:17
I think one of the is just. 00:21:21
Mistake only just shy of us. 00:21:23
Of, uh, the common area it's. 00:21:24
Actually pointing towards the growth. 00:21:26
Mm-hmm. But, uh, do you think, uh, I asked this question, I'm asking the question. 00:21:28
Taking their direction, but uh. 00:21:31
Should those parking spaces be designated private parking spaces or are they sending the open? 00:21:34
Of of it because again. 00:21:39
Private road. 00:21:40
Is for public use. 00:21:41
I don't want that, so I'll make sure that there's like a clear. 00:21:44
Black and white distinction between. 00:21:47
Uh, intense at the parking station. Are you talking like where it says like 3 parking? Like the parking? Yeah. So off, off the 00:21:48
road, Yeah. I mean, typically sometimes the class where they, where they have, uh, private roads that are, uh, open to the public. 00:21:53
They'll have, uh, undeposited cell phones to say and, but the intent of those parking spaces are to be utilized for. 00:21:59
The homeowners. 00:22:05
Early Tuesday, right now. 00:22:07
Of that area. 00:22:08
And not just for, not just a common. 00:22:09
Parking space. 00:22:11
That we just have, uh, private parking space. And then if there is a parking space that's kinda like for a. 00:22:12
Park area that might be open to the public they might spend that would be the same public. I just wanna make sure that we're can 00:22:17
you scroll up? 00:22:20
Up to Athens to the top. 00:22:23
OK. 00:22:25
Yeah, I find I should use the distinction between the intents for those uses of parking spaces. 00:22:26
So Mike, umm, this this road. 00:22:33
I if you, uh, maybe come up. 00:22:35
Is is it so? This road is intended to be a private. 00:22:37
That's a private run, you know I won't just mark them as private. 00:22:41
Parking spaces, it's all controlled by the HOA. 00:22:44
Yeah, like that. I just wanted to make sure there's a black and white distinction between, because there's nothing with that too. 00:22:47
Yeah, it's a public it's. 00:22:50
Open to the public, but then. 00:22:54
It just becomes like a good. 00:22:55
Public park expenses or private parking? 00:22:57
We'll mark them on the Platys Private. 00:22:59
That's all I hear. 00:23:01
Uh, and then anything else rough out this, uh, this is again technicality, but the common space. 00:23:07
I get to go right above unit. 00:23:12
28th. 00:23:13
Dash O-1. 00:23:14
That error for the common space is too. 00:23:16
Pavement, not the. 00:23:19
Of the ARC and not the ARC. OK, again, that's small business, alright. 00:23:20
I don't have any other. 00:23:26
Question. OK. 00:23:27
Any other comments? 00:23:31
Thank you. 00:23:38
Thermotion would be. 00:23:47
Uh, required to. 00:23:49
Approve this. 00:23:51
And umm, this would also need to state the. 00:23:52
Umm, conditions. 00:23:56
For disapproval. 00:23:57
OK, can I get a motion? 00:23:58
4.3 ultra space. 00:24:02
Gonna put uh, so I'll go ahead since I have the comments done. 00:24:03
I'll go ahead and motion for approval. 00:24:07
Horses, uh, fast, uh, phase 4. 00:24:09
Path umm with the condition that. 00:24:13
Uh, the parking spots are designated appropriately to. 00:24:16
Uh, private parking spaces. 00:24:20
As well as the the. 00:24:22
Error on the common space above unit 28-1. 00:24:24
Is correct. It's. 00:24:29
To, uh, show the correct, uh, location. 00:24:30
First question, can I get a signal? 00:24:34
I'll second that. 00:24:37
Second by Brandon and this is by roll call. 00:24:38
Morgan Umm yes. 00:24:41
Mm-hmm. Yes. 00:24:43
Yes. 00:24:45
We're gonna go back to 4.1. 00:24:47
Umm yes. So if if umm. 00:24:49
Brilliant that that, that'd be great. Umm, I think since. 00:24:51
We review that. I think we might have kind of a similar issue with 4.2. 00:24:54
If we could just review 4.2 at this point and I I would suggest maybe we could just make those in in the same motion. 00:24:59
Umm, or or or we could break them out. 00:25:05
That works. 00:25:08
OK, umm, let me just. 00:25:09
Hope the report here. 00:25:13
Umm. 00:25:15
So phase 4 consists of 11 locks. 00:25:16
Great. Umm, I I apologize just to go back to the umm. 00:25:19
The last item. 00:25:23
Did did everyone vote on the motion? 00:25:24
Let me ask you a question again. This is a, uh, procedure question. 00:25:28
Besides the demotions that I actually have to pay. 00:25:31
I don't know. Then you still. Yeah. 00:25:34
Oh man, this half. 00:25:37
And uh. 00:25:39
On 4.3, All right, yeah. 00:25:42
Alright, just a second. That's good. That's good. Yep. 00:25:45
OK. 00:25:49
Umm yeah. So this is the living off. It does have similar aerial, aerial and footing encroachment. 00:25:50
Umm, this one is a different. It does. It does have the bridge. 00:25:56
Umm, and. 00:26:00
What up here? 00:26:02
Here's the flat you can see this is the. 00:26:04
Encroachments right here so you can see the different as it does. 00:26:07
Fan the two box over Dover St. 00:26:10
Umm. 00:26:12
Mm-hmm. Does it a lot. 00:26:15
Umm, they were able to get umm adequate addressing on this one. Umm the one question I did have for the applicant is that that you 00:26:17
got easement. 00:26:21
So abusement ends, right? 00:26:25
Here apparently. 00:26:27
Umm. And I just wanna make sure it doesn't. 00:26:29
Check for the north. It does. 00:26:31
Tim sent me an update, but I don't think I had a chance to. So that was one of the conditions of approval is just to note that 00:26:33
book easement on the spot as well. 00:26:36
Yeah, it goes all the way up to 1200 N. 00:26:40
I think it keeps going north too. 00:26:44
And then we don't have a flat for that next. 00:26:47
Sure, you know, personal to the north, but I think it continues. 00:26:49
The whole length of in your connector and we'll we'll make sure we show a contact. 00:26:53
So, umm. 00:26:58
North Promenade? Where, where? Where would that land? 00:27:00
That that Essex Blvd. That's 1200 more so is OK SO13D. 00:27:03
Is that right above? 00:27:08
10A. 00:27:09
Yeah. 00:27:12
1380 is above yeah or no? 00:27:13
Sorry. 00:27:16
We subdivided 13A and B. 00:27:17
For A&D. 00:27:20
In these plat. 00:27:21
We may have to come in and revise that if. 00:27:25
The parking structure. 00:27:27
Settled both of those lots. 00:27:29
Uh-huh. 00:27:31
But I would we haven't designed that yet, so. 00:27:33
And if that doesn't cycle. 00:27:37
It's track. We just wanna have that. 00:27:38
Oh yeah, it should be for yourself. 00:27:41
Well, let's see. 00:27:45
No, actually that might. I think this is the retaining pond. 00:27:46
Right here. 00:27:49
Zoom in there a little bit. 00:27:54
Or cash. 00:27:55
Yeah, I was thinking Vineyard Connector was 1200 N. 00:27:58
But 1200 N yeah is up there. 00:28:03
Yeah, maybe a little further. It may not be in the right spot. 00:28:06
I'll get a chance on that. 00:28:09
Yeah, make a note on that one. 00:28:10
So. 00:28:13
Umm, I, I did speak with Jamie about the, the language for the in the owner's education and he said that he spoke with, uh, their 00:28:13
attorney. 00:28:17
I believe yesterday on this and and he was OK with that language that was. 00:28:21
Was proposed. We don't have the updated spot yet, but he. 00:28:25
January is generally OK with with the language and simply. 00:28:28
Umm, he just wants to make sure that that the bridge, that the the language. 00:28:31
Of the owner, segregation says where that bridge is at on the elevation. 00:28:35
Umm I I I believe that the the site branches on the 4th floor. 00:28:39
Umm. And he wanted that to be reflected in here, that it would only be located higher up, not like on the second floor. 00:28:43
Cash could you? Umm, unless there's other comments. 00:28:49
Umm, could you read? 00:28:52
The a all the conditions and into the record and then make a motion with those conditions do I have? 00:28:54
Eric, were you sending me the ones from Jamie? 00:29:00
Yeah, you. 00:29:05
OK. 00:29:07
OK, I'm looking for an e-mail. There we go. 00:29:09
OK. 00:29:23
So this is what what, James? 00:29:23
See in it. Let me write these down. 00:29:25
Umm. 00:29:32
Make sure that the bridge doesn't allow for unlimited width. 00:29:34
And that which out of the road which the the right of way is pretty clear and the tax marks of where that bridge would be located. 00:29:37
Umm. So I I think that is addressed in the plat itself. 00:29:43
Umm. 00:29:47
And that it is only allowed on higher floors. 00:29:49
Umm, and not as a substitute for pedestrian traffic. 00:29:52
OK, so that would be condition one. 00:29:57
So uh yeah, yeah. 00:29:59
Oh, let's, let's speak. We can just make that as condition one. 00:30:01
OK. 00:30:08
And travel. 00:30:20
OK, umm. 00:30:22
And then the the other thing you mentioned is. 00:30:28
To, umm, add language about the arcades with overhanging structure over the sidewalk. 00:30:31
And then I'd put like to be approved by staff. 00:30:48
Prior to umm recordation. 00:30:52
35 S. 00:30:55
Sorry. 00:30:58
Does that look OK? 00:31:04
Yeah. 00:31:05
Does that, does that? Is that everything plus the condition that you talked about before that? 00:31:06
Yeah, I have that as as the top one. I'd say any commercial use of the property must be recorded. 00:31:11
What? 00:31:16
I don't know if there's something else you'd like to see on that. 00:31:17
But I mean that works so. 00:31:20
I can hear you because then the the vicinity map. 00:31:24
And then the addressing on Plat 3. 00:31:27
Uh, sort of the two notes that I have. 00:31:29
Update too and the addressing. 00:31:31
Update the float or not? Yeah, for. 00:31:35
The other we we could add that in there. 00:31:38
Just. 00:31:40
Mm-hmm. Alright, uh. 00:31:45
Are you? So you're making your right pipe on the conditions for all, OK. Do you want me to read them all into the records and then 00:31:47
cash before we'll write it down real quick? 00:31:51
Umm, just on the on that. 00:31:55
Pedestrian grades. There is applicable code height for the maximum height umm. 00:31:58
So I don't know if that needs to be on the. 00:32:03
You included that not to exceed. 00:32:06
Work display says higher floors. 00:32:08
Mm-hmm. Not to exceed them. 00:32:10
Which I care it wouldn't because it's gonna have to go through SO to review them. 00:32:12
Alright. And then, uh, OK. 00:32:16
Since you're typing up the. 00:32:22
Uh, conditions. 00:32:23
Uh, can't have the condition in regards to the. 00:32:24
Umm, have everything, uh. 00:32:27
Everything now I I. 00:32:31
I don't know if you wanna call MOU or agreement, uh. 00:32:32
In regards to, uh, the phasing of. 00:32:34
Uh, transfer the privacy. 00:32:37
Private, uh, speak to. 00:32:40
Yeah, how? How you want me to? 00:32:43
Different, uh, just so there is a. 00:32:44
You know their their well-being. 00:32:47
Yeah, just. 00:32:49
He will inquire the recommendation because. 00:32:51
You know if if we just say that there is 1 then. 00:32:54
We can record this and then that condition. 00:32:57
Doesn't push out like the developer. Show uh, the developer in the shower into the, uh, developer AMI in regards to the phasing 00:33:00
of. 00:33:04
Private, uh, and. 00:33:09
For private growth? 00:33:11
Umm, To actually be transferred over to the, uh, city, uh, once the uh. 00:33:13
Like, uh. 00:33:20
I would say prior to, prior to the CEO of the. 00:33:23
Uh, the building of that base. 00:33:26
All right. 00:33:31
So this way when the building is complete and activated. 00:33:34
It's been. It would have triggered the uh transfer though. 00:33:36
Uh, of the payments. 00:33:39
To the setting. So this way we can actually have a kind of more of a timeline with the phasing. 00:33:40
Well, and I'm sure, uh. 00:33:46
I'm I'm sure that the. 00:33:51
Uh, but uh. 00:33:53
You know, 20 tabs especially that's. 00:33:55
We put together in regards to all the payments, uh. 00:33:57
Hey, this is Sarah. Uh, we'll crash on us again. 00:34:00
But, uh, after we do so, so I, I just wrote out the development city health insurance through an agreement to the transferring of 00:34:03
the private St. 00:34:06
Public prioritions of ACO for each adjacent block, Yeah. 00:34:09
OK. 00:34:13
That's fine. And then, uh. 00:34:14
Perfect. Thank you. I know that, uh. 00:34:15
And this I guess is more of an operational thing that, uh, would have to be considered to. 00:34:18
I'm the developer in regards to this, uh, Skype. 00:34:21
And probably kind of like a 5 hour conversation that because we were having right before, uh. 00:34:24
Uh, uh, Brandon, myself and uh, Chris was having in regards to. 00:34:29
Uh, is it concerned is is those? 00:34:33
Private is considered building or is it considered, uh, public, uh, not public infrastructure? 00:34:35
So bridges like for example, bridges are uh. 00:34:41
Umm, anything over over. 00:34:45
Anything over uh. 00:34:49
Uh, longer than everything ADP does because it's a bridge. 00:34:50
Like technically a bridge bridge. 00:34:53
Umm, anything more than. 00:34:56
Anything tend to or why there is as long as. 00:34:59
To the bridge bridge. 00:35:03
Like an official bridge. 00:35:04
And umm, when it comes down to like for example, Center St. to the bridge. 00:35:05
Uh, and uh, even though it's main, even though it's owned and maintained by the city, that state has, uh, authority over it. 00:35:09
In regards to ensuring that the maintenance. 00:35:15
Is being any questions are being done properly? 00:35:17
Alright, so something like this that fall underneath the same category this would be. 00:35:20
Uh, follow the following meetings jurisdiction for for. 00:35:24
Uh, oversized expression by the municipality. 00:35:27
The city as well as the states concerned that the the maintenance is being done properly over over the years kind of where we. 00:35:30
What I mentioned before is that the city does reserve the right to ensure that. 00:35:36
Anything over a public. 00:35:39
Uh, public, uh. 00:35:41
Uh, access is, uh, there's no high. 00:35:43
Uh, so. 00:35:45
Uh, I mean, I take it, take this as like a golf course. A golf course can't decide to have. 00:35:46
Uh, and putting uh. 00:35:52
Uh uh, route through a public St. 00:35:54
Desire to act so people are shooting golf balls through. 00:35:56
That would be considered the the illegal use of aero air. Uh. 00:36:00
So hazardous use of airlines. 00:36:04
Uh, T times Times. 00:36:07
Uh, I just wanna make sure that. 00:36:08
I don't think this has that has to be part of the class, but I think, uh. 00:36:10
Uh, should have just That should just be consideration of the developers and share. 00:36:13
So the proper umm, yeah. And, and maybe that is something we can tackle with the site plan itself as we look at that bridge 00:36:18
further, you know? 00:36:21
Umm. And then we might have some conditions in there that like all inspections or whatever. 00:36:24
You know. 00:36:29
State and city. 00:36:30
Standards for for. 00:36:31
Yeah, I think what we have right now is is gonna be. 00:36:34
Probably sufficient to get the class in the process. 00:36:36
And then we can work like the UMM on UMM brand and exchange concerns through like the building and the site plan and stuff. 00:36:39
So the one other thing that Patrick brought up? 00:36:47
Just ask prompt. 00:36:49
Umm on 17? 00:36:52
Or 17. 00:36:54
There's the 10 foot TV. 00:36:55
That goes West, east. 00:36:57
And he's requesting one that. 00:36:59
Does Mark S look like the other blocks have that? Yeah, they should have it too. OK, let me put that on there as a, as a 00:37:01
condition. 00:37:04
OK. 00:37:07
And, uh, you know when? 00:37:08
Blocks when we actually bring in the building. 00:37:09
We see how it lays out within these blocks. We'll, we'll. 00:37:12
Just like block 4 for the grocery store will probably come in and record a new plat that actually. 00:37:15
Hit these lot lines exactly where they should be. 00:37:20
Fixed on the building design. 00:37:23
OK. And the the easements will be adjusted? 00:37:24
A few weeks will be adjusted for that. 00:37:27
Uh, real quick on the bridge, I just wanted to point out. 00:37:30
That the actual bridge spanning the road. 00:37:32
Is about 20 feet. 00:37:36
Because. 00:37:38
Some of the building you see where the little rectangles are. 00:37:39
Where the columns are landing down on the ground. 00:37:42
The units were expensive. 00:37:46
To that point. 00:37:47
And then the bridge just spans the actual asphalt. 00:37:49
From. 00:37:52
Building phase to building phase. 00:37:52
So the actual bridges. 00:37:54
It's like right around 20 feet wider, maybe 22. 00:37:56
Perhaps the curbs? 00:38:00
That's fine, alright. 00:38:01
To clarify that. So this, uh, rectangular inside the hash mark. Those are those are. 00:38:03
Call him on the check. I was going through the street. Yeah. So anything like that? No, not in the street, in the. 00:38:07
Like back behind. 00:38:12
So the columns will land behind her. 00:38:15
And then the bridge. 00:38:17
The actual St. which is. 00:38:20
Like 20 feet wide. 00:38:22
So the the. 00:38:25
So the lower rectangles are encroachment. 00:38:26
Where? Where we touched down on the ground. 00:38:29
And then everything else is. 00:38:31
Aerial. 00:38:32
So I guess the question is. 00:38:33
The the actual. 00:38:35
Maneuver and navigate and navigability around three years. 00:38:36
Was driven by the. 00:38:40
I don't it's restricted by the curb. 00:38:42
The curb is beyond both columns. 00:38:44
So there's like a bulb out or something, Yeah. 00:38:46
So they're protected by. 00:38:50
How wide is that? How wide is that treatment for like, let's just say? 00:38:52
I think it's 210 foot travel length. 00:38:57
To emphasize our. 00:39:00
OK, but then there's also. 00:39:02
You know the curve and. 00:39:06
Is also in that. 00:39:08
So it's probably a little over 20 feet. 00:39:09
But when we come in first pipeline, you'll see exactly. 00:39:11
OK, I've worked as well. Yeah, I guess we are in for site plan app. 00:39:14
But in fact, in fact, that the attentive Spanish is very rich. 00:39:18
Uh, Larry Barber. 00:39:22
OK, my last city we, we would hit, uh, we would be. 00:39:24
Uh, translators. 00:39:27
And Oh yeah, or if we had a problem with a uh. 00:39:29
We have problem with a uh over like a small uh store marketing to say, we come back and say it was no problem because it was 00:39:32
contacting to attempt. 00:39:36
Oh, you, you know what? Those are cash. I think it's because they're putting. 00:39:40
The footing is wider. 00:39:44
So the actual touchdown of the column. 00:39:45
Is wider than that 15 feet, but the footing down below. 00:39:48
Low grade. 00:39:51
We'll have that. 00:39:53
15 foot 8. 00:39:54
Yeah, between them. 00:39:56
But that'll be under the road. 00:39:58
Yeah. 00:40:00
So it's a column I mean. 00:40:01
I I know we're gonna look at that inside plan building, but. 00:40:02
Since we're not specifying dimensions here, that's on fire. Has looked at for like, you know, with 5000. 00:40:06
Such a small. 00:40:20
Portion where they have to look at like parking spaces generally after that OK yeah this was one that we. 00:40:21
We talked about like a dedicated parking. 00:40:27
For OK. 00:40:30
Emergency vehicles. 00:40:31
OK. 00:40:33
Great. 00:40:36
Umm, yeah. 00:40:37
So you want me to read these? 00:40:38
Yes, you can read those. Another record that umm what? What? Why don't we do this umm. 00:40:40
If that's OK by share, yeah. 00:40:44
OK, umm. 00:40:46
Motion to approve. 00:40:47
Umm, business. 00:40:49
4.1 Utah City, phase Three. 00:40:51
Platt Amendment. 00:40:54
And 4.2 Utah City. 00:40:55
Phase 4 Plat. 00:40:57
With the following conditions to be read in the record. 00:40:59
Any commercial uses of public property must be recorded through your separate plat. 00:41:02
The bridge is located. 00:41:06
On higher floors is to not substitute for pedestrian traffic. 00:41:08
Uh, it includes languages about arcade with overhanging structure over the sidewalk. 00:41:11
Umm it is to be approved by staff and City Attorney. Park reputation. 00:41:17
Umm, they update. Any addressing issues they update. 00:41:21
Smoke easement on Phase 4. 00:41:24
That the vicinity map on. 00:41:27
Plat and then phase four block 17 contains a 10 foot PE and NUI. 00:41:29
And the developer and city shall enter into an agreement for the transferring of the private St. public. 00:41:34
First issuance of. 00:41:38
For each different block. 00:41:40
Thank you. 00:41:42
And then, umm, any conditions listed in the staff report would be applicable as well. 00:41:43
That's my motion. 00:41:47
Thanks first time. 00:41:48
Second by Eric, All in favor. 00:41:51
Bye bye. 00:41:53
All right, bye. 00:41:54
We'll move on to our work session. We have one work session, 5.1 venue properties of Utah. 00:41:57
Well, six site plans that would with think on representing Martin Snow and MSI properties of vineyards is requesting review of 00:42:02
what. 00:42:06
6 Cyclone. 00:42:09
Application. 00:42:11
Alright. 00:42:13
Alright, uh, Yep, I'll handle this one as well. 00:42:17
Umm, so this is the site plan a few weeks ago. Generally we don't have a lot of comments from it from planning. I think 00:42:20
engineering is done a decent review of it. We kind of have one. 00:42:24
A major question to to talk about in this meeting. 00:42:29
So I'll get to that. Umm, just give me context here. This is the site plan. 00:42:32
Tile point is located just about right here. 00:42:35
And just to the top of it. 00:42:38
Here's the site, the kind of their traditional white concrete structure. 00:42:42
Umm, that. That's been building along the 1750 and and 1600. 00:42:46
This is the site, umm, we, we had no issues in terms of parking. They, they met those standards. 00:42:51
Umm, same thing with landscaping. The original pipeline wasn't quite up up to the. 00:42:57
Be with our our standards, but they were able to pick that and and. 00:43:01
Put an additional planting. 00:43:04
Umm, they have access to the site through this street here. 00:43:06
As well as this street right here. 00:43:10
Umm. 00:43:12
The may maybe what we can do is we can talk about this access so. 00:43:16
Back here there is a. 00:43:19
A drainage easement. 00:43:23
Umm, the the New Wind and Heritage Trail actually runs right here, uh, where my mouse is at. 00:43:25
And there is this little canal that that. 00:43:31
Just to the north of their property, so there's this train easement. 00:43:33
Umm that this. 00:43:37
Road this Access Rd. approach is on and so Patrick has been working with the city of women because they're the ones who have that 00:43:38
movement. 00:43:41
To kind of figure out. 00:43:45
Next steps on on how this road could be constructed so all him. 00:43:46
You know. 00:43:50
Yeah, so. 00:43:54
So I did some digging into the drainage easement. What I could find was there was an agreement is I think it's between Orem, 00:43:55
Pleasant Growth, Linden. 00:43:59
Convenient, umm, just to maintain the the. 00:44:04
The ditch that runs. 00:44:09
Run through here. 00:44:10
Umm, they collect. 00:44:12
Storm water from. 00:44:13
From. 00:44:14
Uh, kind of settled in that in the Linden Hollow area that that. 00:44:15
That's, uh, wetland area. 00:44:19
That big green, the wetland area, and then it runs through the ditch to the lake. 00:44:22
Uh, so from what I can see. 00:44:28
It it appears that. 00:44:31
Uh, back when the agreement was was made Vineyard City. 00:44:32
Uh, created this. 00:44:36
Uh, it's actually a 50 foot easement, 25 feet on each side of the property line, raised 25 feet on the other side as well. 00:44:38
So they. 00:44:46
They in that room, they decided that it was a 50 foot pitch. 00:44:47
Umm, so that's why they created this easement. 00:44:51
Umm. So I, I did talk to Linden about it and, uh, they. 00:44:55
They don't think it was. 00:44:59
Would be an issue to constructing there as long as. 00:45:00
Umm. 00:45:04
It was coordinated with the Army Corps of Engineers to determine if there was any wetlands being. 00:45:07
Uh, disturbed or needed to be improved? 00:45:12
Umm, and if the flow was not? 00:45:16
Was not blocked. 00:45:18
Umm, I did find an agreement that kind of went through. 00:45:20
Uh, design flows for the ditch. 00:45:23
So. 00:45:26
In in my umm approval with conditions on. 00:45:27
On this site or this plat? Umm. 00:45:32
I I just noted that. 00:45:35
That, uh, the retaining wall for that it's really needs to be more clearly identified. 00:45:37
Umm, with elegation showing you being crushed and on into the ditch bank. 00:45:42
Umm, but there needs to be coordination with the Army Corps of Engineers about the wetlands. 00:45:47
Uh, the flow of the ditch. The required flow of the ditch needs to be. 00:45:54
Assess and and. 00:45:58
Uh, verify that it it will not be. 00:46:00
Prohibited. 00:46:02
And then there's a lot of flag. 00:46:05
That runs. That makes up the the. 00:46:07
Going to that ditch. 00:46:10
And we, we talked, uh. 00:46:11
Of applicant and I talked about removing that. 00:46:13
Flagging, uh, creating more of a natural. 00:46:16
Last week. 00:46:20
Protection there at the bottom of that retaining wall. 00:46:21
To improve the conditions of the ditch. 00:46:24
Which was actually part of the, uh, the initial agreement for the ditch in the wetlands that. 00:46:26
A lot of the flags would be removed increase. 00:46:32
Create a kind of a. 00:46:34
More natural. 00:46:36
Ditch sync. So Patrick is the We can't involve the bolded line. 00:46:37
Yeah, that's right there. OK. 00:46:41
And so essentially, umm, 1 is saying check with our core, make sure it's not wetlands, you have the uh, proper. 00:46:43
Permits in place if it is a wetland. 00:46:50
Umm. 00:46:52
And so do we. Do we? So what we do we have your stand. 00:46:53
We don't have any details on the retaining wall right now. Do we know like height like? 00:46:56
We don't know height. 00:47:00
The the the times don't really show enough detail to show how far. 00:47:01
I mean it shows how far into. 00:47:06
The the ditch bank is running but it doesn't show the the elevation. 00:47:09
Clearly. 00:47:13
Umm, enough to determine kind of where. 00:47:14
Where things weigh, yeah, they're retaining. 00:47:18
I was all underneath those permits. 00:47:21
Uh, during this process for before the dawn department leave review, Yeah, the bill department. 00:47:23
So. But I think also. 00:47:28
Uh, uh, the condition is to ensure that, uh. 00:47:30
Capacity of the uh canal doesn't get, uh doesn't negatively reduced. 00:47:32
Yeah, I think I got back here just right, right up against it. I mean, with the applicant being here, is there? 00:47:37
You know, OK, I can. 00:47:43
Is there a way to sort of redesign the building and pull back a little bit so we're not? 00:47:44
And then PMPD in umm that area. 00:47:48
We pulled that building back. 00:47:51
Sorry, we'll have to. 00:47:54
Yeah. 00:47:56
Sure. I mean, let me. 00:47:58
The owner doesn't wanna. 00:48:01
Makes the building any smaller. 00:48:02
So. 00:48:04
The other we can just delete the road. 00:48:05
We just wanted it for maintenance and for fire. 00:48:08
How would you access the back parking lot? I'm not. 00:48:11
I'm not against it, right? I'm just wondering if you look at any alternative, but it sounds like you. 00:48:14
Yeah. 00:48:19
We, we, we just really wanted to clean it up that whole. 00:48:20
Each bank, right, There's pretty Yeah, first Bank. 00:48:24
Especially with your hiking trail going. 00:48:27
On the other side, have a good favorite doing that. 00:48:30
Uh, packing in the canal. 00:48:32
As long and then I mean, and then you could do it, you could do a temporary, uh, I mean it would be an easement on top of the. 00:48:34
On top of that, now which Rd. is a would not be considered a permanent, uh, permanent, uh, improvement anyway, no. 00:48:39
That could be condition, that could be. 00:48:47
Consideration as you pipe. 00:48:48
Now that would be if you would like to have. 00:48:50
I think that there would be hesitation by. 00:48:53
By the other partners, OK on that whole? 00:48:56
Umm project because it is intended to be a restored. 00:48:59
Area so they. 00:49:03
They've done work on the other side of the same bank. 00:49:04
And a recreational trail going on. And if it's intended to be? 00:49:08
International, an amenity to the side of the trail. 00:49:12
It's it'll be just. That's all right. 00:49:14
Put some billboards with some pictures, like my pictures and like there's water right here. 00:49:16
But they are doing the retaining wall on the north side of it similar to what we are doing, just trying to. 00:49:30
Pull back the trail net and retain it to where it's all functional and, you know, various. 00:49:35
The flows as it does have higher flows at times. 00:49:40
That that's essentially. 00:49:43
We're trying to manage exactly what's the cost. 00:49:44
Away from us. 00:49:47
In in what I think our concern again. 00:49:48
See, like what Patrick was talking about just ensuring that, uh, the proper. 00:49:51
Agencies have the are looking at and then. 00:49:54
Because of what the agreements that was done back in the. 00:49:57
Hey there with, uh, all the cities and, and I believe Mark. 00:50:00
Yeah, Mark Martin's know that's not an agreement I believe as well. 00:50:04
Uh, that, uh, we're not, uh, negatively impacting like the. 00:50:07
Uh, this? 00:50:11
The flow Washington storm water. 00:50:13
From because it does the fact that I mean it would have negatively impact. 00:50:15
The surrounding property. 00:50:19
I mean, we could. 00:50:21
It sounds like. 00:50:22
One of the conditions is that they would. 00:50:23
They would seek and. 00:50:25
And receive. 00:50:27
Either a no. 00:50:28
No action needed or. 00:50:30
Or some sort of accommodation from the Army Corps of Engineers? 00:50:31
Mm-hmm. And we could just. 00:50:35
Make that as a question. 00:50:37
Yeah, so I already spoke with our, our record, uh, engineers. They said as long as we can go below the high water. 00:50:39
Uh, you didn't need anything from them. 00:50:47
And we were able to get that in like a e-mail or something like that in an e-mail, but that was. 00:50:49
I asked that for your own sake, not sure. 00:50:54
Not for hours, just. 00:50:57
You would you would you want some sort of? 00:50:59
Paper trail that I made the request. 00:51:01
I responded as such. 00:51:03
That would be part of the time, yeah, we would, we would want that before approval from Planning Commission that's gonna come out. 00:51:05
And then the, I believe, I think it was in the notes about this just the storm water, uh. 00:51:10
Couch to show that they have a drainage calculation, the drainage calculator, the flow calculation, yeah. 00:51:16
Yeah, I mean. 00:51:22
Yeah. 00:51:23
With with talking with the applicant, we, we see this as an opportunity to to beautify and kind of restore that ditch base. 00:51:24
As well, because. 00:51:32
Like I said, part of that, uh, agreement that was established. 00:51:33
Umm, it was. It actually moved the ditch at one point. It was running through just. 00:51:38
Fierce flag eventually. 00:51:43
And they were concerned with. 00:51:45
The flag being picked up and and taken to the to the lake. 00:51:47
Umm. And so this is kind of an opportunity to take some of some more of that flag away. 00:51:51
Keep it away from. 00:51:56
Do we have a umm? 00:51:57
Any any landscaping plans like how how are we? 00:51:59
Are there other things that we can see as part of this work session? 00:52:02
Uh, cash is presenting the landscape time now. 00:52:06
Umm, I would think along that. 00:52:10
Retaining wallet would just be seated with natural. 00:52:12
Vegetation. 00:52:15
And we kind of didn't know. 00:52:17
Which direction to head until we? 00:52:19
Yeah, through this point. 00:52:22
Uh, like I said, we can add landscaping down through there. 00:52:23
That's not a problem. 00:52:27
We just we didn't know whether we're gonna keep the road in the retaining wall or. 00:52:29
Perhaps to pull it all out. 00:52:33
So I, I bore umm, these Planning Commission side plan. So I, I think this, this is great. I I'd like to see a umm. 00:52:34
OK, I just you, you can touch. OK, I I I'd like to see, umm, a cross section and a design that includes. 00:52:42
Like the the bank restoration, I think that. 00:52:48
That that is a really great benefit and that's part of the impacted area for the site plan. So if we could have. 00:52:51
More details on that clarify. 00:52:56
Umm, what kind of kind of what what the retaining wall is gonna be? Umm. 00:52:59
Then I don't. I don't necessarily have any any other questions but but. 00:53:03
Except for like that N parking lot, you have the docks coming. 00:53:07
OK. Like is the parking lot connected to that? That highway account is 1750. 00:53:11
Yeah. 00:53:17
That'll be connected to it. 00:53:18
OK, Yep. 00:53:20
Yeah, the their original landscape plan actually did show for for the whole area to be landscaped with like a native graph. 00:53:21
He's umm. 00:53:27
So yeah, I, I think it's good to have this conversation first, Umm, and then the the other thing Patrick and I, we're, we're 00:53:29
discussing if the, you know, the. 00:53:32
The best solution here is to move that road. Then then we definitely wanna see. 00:53:36
So what that area would be ramps it does. 00:53:39
As we try for umm. 00:53:42
For Planning Commission, but like the landscape plan. 00:53:44
Maybe get something in writing from from London? 00:53:46
It's that that that is the reason. I just wanna make sure that they're gonna. 00:53:49
Whatever goes to Planning Commission has a thumbs up from from Linden so. 00:53:53
Yep. 00:53:58
We were gonna actually stake it, stake that retaining wall and have Patrick come out. 00:53:59
Look at it and see exactly where we encroached and what we were. 00:54:04
We were cleaning up. 00:54:08
OK, wonderful. 00:54:09
Yeah, $500. That's probably a good opportunity to have, uh, Linden out there for you. 00:54:10
Yeah, it might be off. 00:54:13
Because of an existing. 00:54:15
Because it's been you're sitting on both sides, right? 00:54:17
Yeah, just to clarify the easement. 00:54:19
I think it's convenient to the evening. Umm. 00:54:21
But that but it was established because of the agreement with Pleasant Growth Forum and Linden. 00:54:24
Just to clarify. 00:54:31
OK. 00:54:32
Can I get y'all's name for the record? 00:54:34
Brentwood. 00:54:38
Kevin. 00:54:47
Yeah, that's part of the meeting. 00:54:51
We speak. We need your name. 00:54:54
Do you have umm? 00:55:02
Just just to look at them, we have to. 00:55:03
Any details? But like is there elevation or anything we can take a? 00:55:05
Click Look up. 00:55:09
And just after clarifying every morning, you, your question on, uh, how that. 00:55:11
Back, uh, parking lot from there. 00:55:17
So it it doesn't really look. 00:55:19
Like it does, but that's concrete. That's a concrete driveway on the website. Yeah, the way. 00:55:21
The next billing. 00:55:29
Can be a wider act. 00:55:32
Right, that's correct. 00:55:33
OK, yeah. And here's here's the elevations. And these are also things that that I, I have quite a few comments on. 00:55:37
Umm, but they they did. 00:55:42
So I did request that they add additional windows. They they accomplished that and then on. 00:55:44
North elevation with that parking lot there, you have a lot of employees entering and so I wanted to make sure that they had an 00:55:48
employee entrance that they could. 00:55:52
Umm, quickly access the building and so that. 00:55:55
Right here. 00:55:58
Umm, there's not. 00:55:59
West elevation with the garage base. 00:56:01
Some east elevation with another entrance. 00:56:03
And then the South elevation. So this is what you'd see from something 70. 00:56:06
And then for, for Planning Commission, if you could provide, umm, these are kind of things that they, they always wanna see. 00:56:09
Like, like color. Like what? What? What's the? Yeah, yeah. You know the bright pink this time, right? 00:56:15
With with, with bright pink and bright orange. That's what we're going for. 00:56:23
Well. 00:56:27
Yeah, there we go. 00:56:29
Yeah. 00:56:31
So yeah, they they did have the color legend here to show. 00:56:34
Black and white. 00:56:40
Like 1 OK. 00:56:44
OK. So, uh, cash up, have you reviewed like our design standards, yes, pipeline, do they, do they need those, those two? 00:56:46
OK. 00:56:53
Alright. 00:56:54
Umm, any other comments is fine. 00:56:56
Anybody have any comment? 00:56:58
Uh, my only comment was that. 00:57:00
Uh, just the. 00:57:03
Appendix D. 00:57:05
Approved. 00:57:06
In compliance signage for no parking long that if it. 00:57:07
If it ends up working out, please. 00:57:11
Yep, thank you. 00:57:12
OK, so this is slated potentially for, for next Wednesday for uh. 00:57:15
Final question, if we can get those documents? 00:57:20
Umm, it's not. We'll bump it to the next meeting. 00:57:22
OK. 00:57:25
Like I said there, there should be no motion from this actually on the. 00:57:28
Any other comments from in both? 00:57:32
OK. 00:57:35
Shell observation. 00:57:36
Thank you. 00:57:38