Welcome everybody. It is August 3rd. This is the Vineyard Planning Commission meeting. 00:00:05
We'll get right into it. Anthony will give us a Pledge of Allegiance. 00:00:10
I pledge allegiance to the flag of the United States of America and to the Republic for which it stands, one nation under God, 00:00:18
indivisible, with liberty and justice for all. 00:00:24
Great. Thank you, Anthony. All right, right now is an open session. If you have any comments for the Commission, you can come up 00:00:34
to the microphone, state your name and make any comments either you guys have any comments? 00:00:41
Cool. All right. If not, we'll move right into the minutes review and approval. Do I have a motion on that? 00:00:48
Yeah, I make a motion to accept the minutes from July 6th. Do I have a second? Second. All in favor? Aye. All right. Moving a 00:00:56
business item 4.1 Holdroy field preliminary plat application. 00:01:01
OK, Nate, can you hear us through the Microsoft? 00:01:29
OK, perfect. All right. My name is Brian Maya Perez. I'm a city planner here in the Community Development Department. And we're 00:01:35
going to be reviewing the preliminary plat that was submitted by Ryan Bybee and Neighbor child with Cadence Homes and Good 00:01:40
Goodborough. 00:01:45
So to provide you a quick summary. 00:01:52
So I'm just going to change my slide here. 00:01:56
They're requesting a request an approval of a preliminary plat for all the way Fields development. The property will be developed 00:02:00
in accordance with the development agreement approved by City Council on July 13th, 2022. The preliminary plat proposes 295 single 00:02:07
family detached residences and was prepared in accordance with the Vineyard City Subdivision Code and Holdaway Farms Special 00:02:13
Purpose Zoning District. 00:02:19
The preliminary plot shows the general layouts of the streets, the alleys, blocks, etcetera. 00:02:26
And the overall purpose of the preliminary plat is to show the lots that are being created by the subdivision, ensure proper 00:02:30
coordination of public private St. systems and circulation, review the demand and availability of Public Utilities, parks, open 00:02:36
spaces and recreational sites, and to review the product densities. 00:02:42
The approved learning plot. 00:02:49
And development agreement. Then invest the applicant with various development rights including density, St. configurations and lot 00:02:52
layouts. 00:02:55
So I just want to give you guys a breakdown of the residential units and their proposed categories and sizes throughout the 00:03:01
project. So just as a caveat, there's no attached residential products that's being proposed with this preliminary plat. The 00:03:09
preliminary plat only proposes detached single family units. So a lot of us might be familiar with the project. 00:03:16
As we've attended the various meetings throughout the last year, estate lots, they're proposing 150 estate lots. 00:03:24
18 village lots, 127 cottage lots and a total of 295 total lots. 00:03:32
In terms of phasing? 00:03:41
Here's a map that shows the proposed phasing. The Hallway Field Subdivision will be developed in accordance with the phasing 00:03:44
schedule set forth in Exhibit D of the approved Development Agreement from that July 13th, 2022 City Council meeting. The phasing 00:03:52
is to ensure continuity and orderly development of the project, installation of infrastructure improvements, future road and 00:03:59
utility capacity needs, the availability of access to all portions of the project, and all other related considerations. 00:04:06
In terms of traffic and circulation, the preliminary plot that's been submitted labels all existing in future roadway connections 00:04:19
and the proposed names. The preliminary plot labels all private and public roads or and roads to be dedicated to the city. They 00:04:27
provided a roadways cross section on page C 13 of the preliminary package that shows the road dimensions and the profiles. 00:04:35
Let's talk about parks and open space. The plan labels are intended areas for parks, trails and open space. Here are the parks, 00:04:47
the public parks that are being proposed to be dedicated to the city. The east park on the far right is is going to be 5 acres in 00:04:54
size. The Holdaway Park on the southwest portion of the. 00:05:01
Site is also 5 acres and the bike trail park in the northwest section is 2 acres. 00:05:09
And in regards to private parts and recreational areas, there will be an age restricted clubhouse, pool and associated private 00:05:16
amenities that are just under an acre in size towards the middle of the of the project at the intersection of 400 and Main. 00:05:24
Talking about utilities and services, the applicant is labeled on the preliminary plat all the appropriate connections and 00:05:36
improvements for culinary water, sewer, storm drainage, ground drainage and electrical power. They also show several connections 00:05:42
for fire hydrants, 12 foot St. lights, 20 foot St. lights and overhead and varied power lines. The preliminary plan proposes an 00:05:49
underground storm water detention system beneath the future Holdaway Park, which is the one on the. 00:05:56
Southwest portion of the property and the permanent plot proposed to remove several concrete ditches. Previously missed irrigation 00:06:03
and irrigation of agricultural lands. 00:06:09
The applicant has labeled all existing and proposed St. trees. It's a little bit hard to see on this map, but this is Sorry. This 00:06:16
is a utility insurance that I should pump up earlier, but this is the trees and vegetation. It's not landscaping plans within 00:06:25
individual building. Building permits for each lot shall conform generally with with the landscaping being shown here. 00:06:33
Morgan, I think you should talk about this really quick. The landslide with Jacob Holdaway. Did you clarify that for the plan 00:06:46
Commission? Sherry, do you want to pull the map up? Yeah. 00:06:51
Yeah, if you just show where it's squared up on the east part, yeah, you can actually joggle between the two. So this is how the 00:06:59
neighborhood plan had it laid out. If you can see on that E park where there's kind of the the indent along 400 S, the the parcel 00:07:08
line is at an angle and as it connects to four or South. And they were kind of an awkward park layout. And so the developer. 00:07:17
Worked with Keith Holdaway, the owner of the property just to the the east of of that that park and they they did a small land 00:07:26
swap that that basically just made it a straight line. Do you want to jump to that look like the next next slide? 00:07:34
There you go there. So it shows it. 00:07:46
That's squared off. So anyway, just wanted to bring that here attention. 00:07:49
Are you able to see that? Do you have any questions about it Planning Commission? 00:07:53
Well, in the throbbing of the land, what what was it? Who gained what or who lost what? I mean, I know we straightened the line 00:07:57
out, but is it the exact same? And so there's a the same size triangle on both sides of swapped which which made it change the 00:08:02
angle of the. 00:08:07
OK, umm. 00:08:13
OK. Thank you, Morgan. 00:08:16
So next steps for the applicant is after the preliminary plat is approved, the applicant must submit a final plan application and 00:08:20
once a final plan is approved by City Council and by the Planning Commission, it may be recorded at the Utah County Recorder's 00:08:28
Office. Once the final plot is recorded at Utah County, the applicant can ban and submit for building permits. 00:08:36
And then? 00:08:45
As a special note, the public parks and the clubhouse and the humanities shall require separate site plan applications for 00:08:47
Planning Commission approval, so you guys will be seeing those in the future. 00:08:51
So the application is online via Zoom. The Planning Commission has any questions or concerns about this application. 00:08:57
I've got a couple of questions, mostly about the infrastructure going in, if you can go back to the phase map. 00:09:08
I just want to make sure that it's not just the homes, but it's also the road infrastructure that's going in in that same order. 00:09:17
It's like phase one would not connect to 400 S, only to Sleepy Ridge. Is that correct? 00:09:24
Yeah, that's correct. Phase one will connect to Main Street on the north and see the original South. 00:09:33
OK, the reason I'm asking is I think a lot of the people who. 00:09:40
Were either neutral or negative on this project. Saw one of the key benefits as a connection to 400 S. 00:09:46
You know, making another way in and out of the city. 00:09:54
So that not being part of phase one. 00:09:59
I I think that's important to at least acknowledge that, you know, there may be some people saying like, hey, why is this 00:10:02
connecting to sleepy Ridge instead of the 400 SI get it with the with the phasing plan here. But I do think that that's. 00:10:08
I was kind of expecting to see that connection in the first phase and then also have questions about the trail extension. I I 00:10:17
wasn't real clear on which phase that would come in with. 00:10:23
Are you talking about on the the lake, the lake trail? I believe that is slated for the last phase And the reason being, you know, 00:10:31
the cities preferred option would be to have a lake trail that aligns out towards the lake. We don't necessarily want a trail 00:10:38
right on the property line. We wanted it to be part of the actual Utah lake shoreline trail alignment. So out by by the lake. And 00:10:45
so the idea was to push that as far as we could. 00:10:52
Allowing us to time to work with the property owner and then we would build because the the funds the state is already appropriate 00:11:00
funds for that trail so. 00:11:04
We can work something out with the the property owner and there there are some legal disputes about the ownership. So it's kind of 00:11:09
a complex situation, but that gives us some time. 00:11:13
OK. Yeah. I just wanted clarity on that and then just to. 00:11:19
You know, record my comment that I think, I think there were expectations that one of the first infrastructure things would be a 00:11:22
connection to 400 S. 00:11:26
Right or wrong, I mean, right, Yeah, the the City Council had shared this the same concerns and they worked with the applicant. 00:11:32
They did approve the development agreement. And one of the items is that I can't remember the exact unit number, but it's about a 00:11:40
specific unit number. If the infrastructure hasn't been built, then they'll then deed the right of way to to the city. 00:11:49
Which is actually really helpful in case there there is, you know, some sort of. 00:11:58
Terrible economic thing. There's something happens to this project, but it would at least provide ownership of the right of way to 00:12:03
the city. But it's still tagged with phase two of the project. So it, it, it is in a very early phase. But yeah, no, unfortunately 00:12:08
it won't. It won't be right out of the gate. 00:12:13
And is there any what's the thinking about how long between Phase 1 and 2? 00:12:18
That'd be a good. 00:12:24
That'd be a good question for the applicant if negator, Eric or whoever's on, they explained it pretty well in the City Council. 00:12:26
They have a process that they go through. So basically faces start like a phase two would start while phase one was going so that 00:12:32
there's always an inventory houses. I don't know if they want to comment on it. 00:12:37
So yeah. 00:12:47
Morgan, do you want me to comment? Yeah, Yeah. Well, if you want to just provide a little insight on your timeline. 00:12:48
And so the objective once we get started is to not have a gap in our ability to sell homes. And and so the the processes as we 00:12:55
begin selling homes in phase one, we're watching for the pace of that process of that self process and we'll start the phase two 00:13:02
infrastructure. 00:13:09
While we're selling homes and pay amongst us that phase two homes are available. 00:13:18
After concluding, so it comes in phase one. Now having said that, as Morgan said, the phasing was this. This whole concept of 00:13:23
phasing 1 and 2 was located extensively with the City Council a few weeks ago where in if we haven't. 00:13:31
That we haven't begun the planning process after we've sold a certain number of homes in phase one and by the time we sold certain 00:13:40
other poems in phase one, we didn't have the right to ask them with that easement for that roadway to facilitate, you know, if 00:13:47
necessary, construction anyway. 00:13:53
But but as regards overall timing, I would expect that we would. 00:14:01
Being about six months together. 00:14:07
In terms of staging, phase one and Phase 2. 00:14:12
Thank you. 00:14:17
Any other questions? 00:14:20
My only concern with it is the parking on Lakeview St. 00:14:23
I'd rather not see parking there if I think if we're going to do parking, it should be on 400 S and something that you pull into 00:14:29
the way it is now in Lakeview St. 00:14:34
Kind of encourages traffic to go down like V street into. 00:14:39
The Elm subdivision. 00:14:43
Yeah, So just by East Park, that's the, that's, that's the road that's on the West side of East Park in the green. No, the the 00:14:46
East Park, the one to the right. 00:14:52
That road, are you talking about that road right there, right? Yeah. So that, that would be parking specifically for for that 00:14:59
park. We haven't designed it. So we'll go through a site plan process, but that, that, that's good to to know those types of 00:15:05
concerns. The idea was to try to utilize the right of way to accommodate some of the the parking needs for the park so that we 00:15:10
could build a park out and have basically as much open space as we can. We can, but most likely we're probably going to have to do 00:15:16
a, a more of a formal parking lot. 00:15:22
But anyway we can workout those those types of details. But thanks for noting that. OK, so that's not something that's like set in 00:15:28
stone with this. No, that'll that'll come through an official site plan process. So the parks will all go go to you for for 00:15:35
review. OK, so this is just important to note that the developer has part of the development agreement. Developer has agreed to 00:15:41
work on traffic calming along Zippendale to help reduce the. 00:15:47
Volume of cars as well as specifically about the speeds of the cars that may be utilizing different now at all. 00:15:54
It's important to know that the developer is going to be partnering with the city on that. 00:16:00
Alright. 00:16:05
And then there wasn't really details on the crossings around the roundabout. 00:16:10
Are there any plans for that or because I know it's real, there's that trail connection, I just want to make sure that there's a 00:16:16
good way to cross there, if there any. Yeah. And so in regards to the roundabouts, I mean, currently we just allocate the space in 00:16:24
the roundabouts. We're working with our active transportation consultants to help provide us some, some information on. 00:16:32
So I missed work in reviewing the plan. I missed where the roundabouts are. There's just one, right? 00:17:11
20, there are two, Sorry, yeah, there's one. They're both on 400 S. 00:17:19
One of them is at Lakeview where you would enter Lakeview and the other one is at Main St. 00:17:25
It's the Main Street for South Roundabout. You're going to do that. Possibly you're going to look at the other one. Or are you 00:17:32
doing for sure doing both roundabouts? 00:17:36
I don't know if that was in question or not. So the roundabouts that have been proposed and supported with the study that the 00:17:41
traffic engineer, Ryan Hales Engineering has provided by the developer will be around by the Main Street and Center St. which is 00:17:48
kind of there. And also the roundabout that's to the using my fingers to the east, right where the east park is right there 00:17:56
serving us because it's it's, it's halfway there. I'll say like that. 00:18:03
In terms of the studies that came back, that doesn't justify anything about that. And we believe that for this type of level of 00:18:12
traffic, you know, being more towards your residential. 00:18:18
After transportation or more progression, having roundabouts actually leads to a higher level of profitability instead of having 00:18:26
traffic signals where when pedestrian interests for a roundabout they go, they have more free ability to go versus a traffic 00:18:32
signal. 00:18:38
Where they're more is more controlled stop go as well like as well as that, however, I'm sure that you know, everything can change 00:18:44
tomorrow, which I say that very hard, like heart wave, but I think was being proposed here is actually what will be very 00:18:51
beneficial to the city. 00:18:57
I'll help out. 00:19:05
Enhanced like the. 00:19:08
The environment. The visual environment. There we go. 00:19:10
Making words out. Does that go wrong? 00:19:15
All right. Any other questions or? 00:19:17
It's not Do I have a motion? 00:19:23
I can. 00:19:31
I move to approve the preliminary application of Life Fields as requested by Brian Bybee with Cadence Homes with the proposed 00:19:33
conditions of the applicant pays any outstanding fees and makes any red line corrections and the applicant is subject to a 00:19:39
federal, state and local laws. 00:19:45
2nd. 00:19:51
All in favor. 00:19:53
Right. OK. I'm moving on to 4.2. This is a public hearing. So do I have a motion to open up a public hearing? 00:19:55
Motion to open up the public hearing second all in favor aye right. This is the for the site plan conditional use permit 00:20:05
application from X development. OK, thank you. This is still Brian city planner introducing this application. So we got the 00:20:11
applicant Carla Mata with 50 mil LLC seeking approval of the site plan and conditional use permit for two retail buildings at the 00:20:17
yard lot 3. 00:20:23
Address that 661 is 450 N to lottery will be a complementary addition to the mixed-use center of the yard. Both buildings are to 00:20:30
provide desirable amenities and services to venue city residents and visitors. The size of the site is 1.37 acres and both 00:20:37
buildings will house retail uses. The north building will house 1 tenant and then the South building will house 3 tenants. So this 00:20:44
map here gives you. 00:20:51
Some context to where this is located. 00:20:59
Here's the site plan. The property is zoned Regional Excuse Zone intends to provide commercial employment residential uses in a 00:21:02
mixed setting. The applicant is in the process of identifying potential tenants and drive throughs between the front, the 00:21:09
building's front facade and the property. The front property line triggered a conditional use permit. 00:21:16
So. 00:21:25
In terms of site planning. 00:21:29
This is my spots here. There we go. 00:21:33
I wanted to talk about the architecture of the buildings. So the architecture is a modern aesthetic consistent with the surround 00:21:37
development. The architecture features vintage wood exteriors, rib panels, tempered glazing, concrete masonry and ruminant 00:21:44
trimmings and finishings is a very nicely designed building. All colors proposed are subdued earth tones and not contrast with 00:21:50
naturally occurring colors in terms of massing. 00:21:57
Plenty of variations in building shape and configuration are being proposed. 00:22:05
The buildings themselves are relatively small in height and so that allows them to not interrupt any significant views of the 00:22:08
mountains of the lakes. Monotonous facades were avoided through ground level fenestration and recessing and projecting of Laurel 00:22:15
planes, and there's lots of variations in the roof lines. 00:22:22
Each building is proposing to provide a walkable gathering area where people can enjoy a meal. They can sit and dine and and just 00:22:31
enjoy the local amenities. 00:22:36
All elements of the facades and facades at the pedestrian level achieve a sense of human scale and create visual interest at eye 00:22:42
level. 00:22:46
In terms of circulation, the site plan integrates well with Arterial Mill Road to the West and with internal private roads to the 00:22:50
east, north and the South. The parking lot incorporates additional shared parking stalls for future entertainment uses at the 00:22:56
yard, including Top Golf to the east and Interconnected system for ADA, Americans with Disabilities Act and pedestrian circulation 00:23:02
has been provided in and around the site. 00:23:08
Modes of transportation are sufficiently and safely separated and demarcated. 00:23:14
So that means that there's safe interaction between pedestrians and vehicles whenever there's a possibility that they might 00:23:21
engage. In terms of building orientation, all the buildings have been oriented towards Mill Road and the the principal arterial 00:23:27
adjacent to this site. To further encourage the pedestrian relationship with the buildings, each building has a public entrance 00:23:33
off of Mill Rd. 00:23:39
In terms of open space and an accessible Internet, interconnected system of passive and active open spaces have been providing 00:23:46
provided. 00:23:50
The building configuration provides areas of sizable open space and spaces for public gathering. 00:23:56
In regards to parking lot lighting, all areas intended for parking shall be adequately illuminated during night hours. The parking 00:24:03
lot lighting is down lit and poles do not exceed the 20 foot height requirement. Lighting on the site will not spill over into 00:24:07
adjacent properties. 00:24:12
In regards to setbacks, all the setbacks are being met for the regional mixed-use code. So to talk a little bit more on parking, 00:24:17
all the parking aisle dimensions and parking stalls dimensions are are being met. 00:24:24
The code requires a 27 parking stalls be installed, but they have gone ahead and provided 17 additional parking stalls that will 00:24:33
be shared with the entertainment uses throughout the yard. 5.2% of the growth parking surface area isn't is dispersed into your 00:24:39
landscaping. 00:24:44
And two ADA required parking stalls have been provided and 1 van accessible ADA Parkinson has been provided in terms of parking. 3 00:24:51
stalls were provided for the code, but they have provided required for the code, but they provided for that are the inverted youth 00:24:58
design which is what our code. 00:25:05
Calls for and it meets all the other bicycle parking codes. 00:25:14
Umm, let me see. 00:25:19
The parking lot is going to be screened from the street from Mill Rd. with a landscaping berm. So let's let's talk about 00:25:22
landscaping a little bit. The landscaping compliments the architecture. The architecture of the buildings provides the visual 00:25:29
interest and variety, provides screening elements for the drive throughs and the parking lots. It also provides the around 00:25:35
beautification and blends well with the natural landscape and highlights the building features. 00:25:41
All the plants conform with the installation standards within the Vineyard Tree and Landscape Manual. 00:25:49
And all the all the plants and plant species have been selected are drought tolerant codes for the landscaping code. Nearly 20% of 00:25:54
the site includes drought tolerant landscaping that is sensitive to a regional and local water conservation initiatives and large 00:26:04
areas of decorative rock and gravel with dispersed trees and have have been proposed they've kept sod or turf to. 00:26:14
To a bare minimum, I mean long, the Mill Rd. Park strip and. 00:26:24
They've maintained the 25 foot barrier, sorry buffer, landscaping buffer that is required for our landscaping code. They've also 00:26:32
provided a nice streetscape design. 00:26:37
All their trees are two inch caliper and we will require that all their shrubs be 5 gallon in size. There's no detention basins on 00:26:44
the site. They're going to be tapping into an underground, some water detention basin that's a part of lot 2 if I'm correct to the 00:26:49
east of the site. 00:26:55
And all signage is to be reviewed through a separate signed permit. So just wanted to quickly show you guys their landscaping plan 00:27:02
if I got too busy talking. 00:27:07
But you looked over that for a quick minute. 00:27:16
And then here they're building elevations. This is for the South building, which will house 3 tenants. 00:27:23
And this are the elevations for the north building. 00:27:33
Here's a few renderings of the North building. 00:27:43
With the accompanying dining area. 00:27:46
OK, so here are staff recommendation. Staff recommends approval of the site plan and condition use permit provide the following 00:27:50
conditions are not the applicant must complete a traffic study showing the impacts of the proposed development. That was something 00:27:56
that was required by engineering and we're hoping to receive that within the next few weeks on the applicant. All the all the 00:28:02
shrubs on the on the site must be 5 gallon. 00:28:07
Additional some that are 1 gallon and myself and the water manager would prefer that all the shrubs are 5 gallon so that will 00:28:14
require few changes to the to the to the landscaping legend. 00:28:20
And that the applicant the other conditions are that the applicant pays an outstanding fees and make any Redmond corrections and 00:28:26
the applicant subject to all federal, state and local laws. So then if you have any questions for them. 00:28:32
You guys have any questions? 00:28:40
So go ahead. OK, I was just noticing it on the. 00:28:44
Bottom. That's South. 00:28:50
The sidewalk runs right up next to the drive through Rd. 00:28:53
Umm, that like a insurance chef. 00:29:00
Safe, but you know, it doesn't feel safe, and there's someone who would be using that to walk on quite frequently. Live in the 00:29:06
neighborhood South of it. 00:29:10
I don't know 'cause I feel like the trees, I don't want to shrink the space. 00:29:16
Is there any kind of buffer there between the sidewalk and the drive through? 00:29:24
Between the on the South part of the building. Yeah, I believe so. 00:29:28
I'm sure there's a curve, I'm just wondering. Oh, maybe no. It seems like there's a landscaping burn to the South of the sidewalk 00:29:35
but not to the north. 00:29:39
Yeah. 00:29:45
So that's so. 00:29:47
Outside of the things that you brought up, that staff would like to see change that. 00:29:51
I I'm uncomfortable walking there just because people can drive. Well done. Would it be possible to do something very similar to 00:29:56
the north side where it's buffered a little bit but then comes in where you would cross the drive through lane to get into the 00:30:01
restaurant? 00:30:05
Hello. Hi, can I make a comment? Yeah, hello everybody. What's your name? Sure. My name is Carla Mata with X development. So as 00:30:10
far as that crosswalk is concerned, that's all back of house stuff. It's mostly intended for for employees that are going to have 00:30:17
to cross behind and go over to the trash enclosure, which is on the West side there. It's not really so much intended for for 00:30:24
pedestrian traffic like, you know, the the the customers and so forth. So. 00:30:31
So she's talking about. Oh, I thought you were talking about. OK, I apologize. I thought you were talking about the crosswalk 00:30:38
going to. 00:30:42
The southern building. 00:30:45
I'm pulling it up, yeah. 00:30:50
Cortana. 00:30:53
If you can. 00:30:56
So just how the drive through Rd. runs right up against gotcha and just has the curbing right there. 00:30:59
Yeah. So yeah, I'm wondering what kind of a buffer we have between the road and sidewalk other than a curve. 00:31:06
Yeah, and that's. 00:31:14
Split the difference between it 'cause it looks like you're doing shrinking up a landscaping, yeah. Or you, you put it on both 00:31:17
sides if you're at like 6 feet and you just do 3 feet in each side 'cause if it's a desert landscape with the with the drip system 00:31:23
anyway, you're not having, you know, sprayers. Would you, would you be fine with something similar to the north section? 00:31:29
Right, like comes in, yes, at that, Yeah, just like a little bit next to the drive through Rd. feels OK because I I would be 00:31:35
willing to walk on that. 00:31:41
But my, you know, my kids will be probably frequent in these places, probably on their own teenagers, you know, and so. 00:31:48
I, yeah, I just, OK, we will definitely have that discussion with the, the landscape architect and the and most the retail 00:31:57
architect and see how we can, we can shift that over a little bit. I mean, I'd hate to lose the trees too. So I'm a little torn. I 00:32:01
don't know. 00:32:06
Totally. OK, I'll see what we can do there. Yeah, I mean, from our, our goal is to try to keep trees within a minimum of 6 feet. 00:32:12
That's, that's sort of what we've been trying to do. I mean, they can survive in smaller conditions, but you know, they, it's a 00:32:17
root system, a little more space. 00:32:22
878 and a half, yeah. 00:32:29
Yeah, so maybe it sounds like a couple feet then it's like you're, are you worried just about like a tire popping over and 00:32:32
smacking someone or does it come around the corner? Yeah, yeah. So did you just give a couple more feet then? I think OK, yeah. Or 00:32:38
some kind of buffer like a 2 foot retaining wall or something? Yeah, or, or like a handrail even, I mean some, some kind of 00:32:44
barrier. 00:32:50
And pedestrians feeling like, OK, there's something between me and these cars. 00:32:58
OK. Maybe even some grasses or something like that. Yeah, yeah. 00:33:03
So depending on if you approve it, I would recommend adding a condition and you can make a condition as general as you want or as 00:33:08
specific as you want. So you if you guys want to think through kind of what that could be, you know, like the applicant will will 00:33:15
provide staff with some options of providing more, more protection to the pedestrians, whether it's moving the, you know, the 00:33:22
landscaping to that side or some other entertainer, right? Exactly. 00:33:28
Right, Yeah, I don't think I need to like a specific. 00:33:36
Yeah. Is this just for separation or do you want to do it to be for for safety reasons or just a line of demarcations? They 00:33:41
realize there's cars there, safety, not enough to stop a car, but you're looking at like a minor. 00:33:48
Just like with the with roads, we can't just like stick a bunch of. 00:33:59
Speed bumps everywhere, but we can have speed medication. 00:34:06
Step so like this would be more of a. 00:34:10
The card notices that there's plants and maybe they're going to be more careful with their car around that area between. 00:34:13
Now there's, there's rocks there placed too. Isn't that what you're showing? It's showing that's not between the sidewalk and the 00:34:24
drive through aisle. Yeah. So just right there, just be like moving the sidewalk a little bit South. And if I may, I have a 00:34:31
little, I have some language that you guys could consider. So I wrote as a condition landscaping buffer at least two to three feet 00:34:37
between the southern drive through aisle. 00:34:43
In the pedestrian walkway South of the southern building on the site shall be provided. So I don't think it needs to be two or 00:34:50
three feet if it's something more solid, so wall or even like posts with the chain or yeah, it doesn't mean to be landscaping, 00:34:56
just some division could be post with change between them or something like that. 00:35:02
But I mean, obviously the landscaping action will look better. Yeah, we'll come up with some proposals I think staff could handle. 00:35:09
Yeah. 00:35:17
I had a similar question, but it was around the architectural rendering of of the outside dining areas and I didn't see any 00:35:25
division between the dining area and and the roadway. 00:35:32
And I may have missed it. I mean go on to the next one. 00:35:39
Down right in there. 00:35:44
Is there OK and I may have missed it but I just wanted to make sure there is barriers between the outside dining and the roadways. 00:35:49
Yes. And Tyler, did you want to speak to that at all or? 00:35:59
No, I mean I there was about that separation. Yeah, in the renderings there is a fence. 00:36:03
OK. Any questions, Chris? 00:36:11
So for the outdoor dining, I know a few meetings ago we talked about this, making sure there's room to go around the dining for 00:36:14
like ADA accessibility. So that's verified. If not, any problem with wheelchairs and stuff getting around that, specifically that 00:36:20
corner in the rendering of the building where the fence is. 00:36:26
Should be that top left corner on the corner right there. Obviously we can't see what that distance is, but I suppose there's 00:36:37
enough room. 00:36:41
Yeah, that's a good concern. 00:36:45
Yeah. And I think that will come more along with the the tenant permits, correct for the as far as when they have to go through 00:36:48
their approvals for that, I'm assuming that will be addressed at that time. 00:36:53
I mean now is is when we could attach that that detail. I think the things appropriateness iPhone application is in my opinion OK. 00:37:02
Yeah. 00:37:14
Steve Hutchings, Excellent. Can you go back to the site plan? 00:37:16
So we were talking today about sorry I lost my voice the other day. If you could scroll on to the top building there, that N 00:37:21
building. 00:37:25
We were talking about moving that that crosswalk slightly down just to by just a little bit more room for Ada on that side with 00:37:30
given that that was a a plan for a outdoor dining so that that ramp just right on the right side of the screen there that could 00:37:38
come down to more feet or so just to provide enough room for that cool. So. 00:37:46
So, yeah, we're already in discussion. So thanks for that question. 00:37:56
Any other questions? 00:38:05
I don't, but we are in a public hearing, so I think we've got some. 00:38:08
Yes, my name is Donna Hurlton. I'm a resident. I noticed there's a lot of areas where like the crosswalks are that appear to be 00:38:11
brick or a different sort of material. I was wondering if those would be raised. I know a lot of the times when I'm walking in an 00:38:18
area with with a brick type of area where if it's the same level as the as the asphalt, I don't really notice any difference in 00:38:25
cars, whereas they tend to slow down more if it's it's raised up a little bit. 00:38:31
All I gotta say about that is that it's it's a. Yeah, it's a good comment. It's not expressly a requirement for the code. The code 00:38:40
simply states that a stamped or different cheating material needs to be provided. 00:38:47
So. 00:38:56
Yeah, that's just something to consider, I guess. 00:38:57
I can make another comment. So we're, we're aiming to have uniformity throughout our center. We're trying to keep it at grade. It 00:39:01
helps with the stacking and so forth. And and it's also more visually appealing as well. So we're trying to keep that at grade. 00:39:09
Who's honestly, by the way, and just in regards to speak on that, typically with those areas where you have the raised crosswalks, 00:39:21
especially with the way for them to be effective is that they're like speed tables and speed table is something that's really 00:39:27
wide. And so when cars are going over it, they're they're approaching it. Then in essence, what you can do is you can almost park 00:39:32
a car on top of it. 00:39:38
Areas like this doesn't really provide that type of. 00:39:44
Is it? It would not compliment this type of area. 00:39:49
Where you where you have cars are especially coming out of a drive through that would actually provide. 00:39:53
When there's good conflict and bad conflict, roundabouts are good conflict. Something like that would actually provide some bad 00:40:00
conflict as cars are trying to drive out. Like for example, I use a lighthearted example that when I go through a drive through, 00:40:04
one of the first things I look for is that they give me my food and I'm doing that while I'm driving out. And if I'm hitting a 00:40:08
bump I've had. 00:40:12
A different of mine. That guy. 00:40:18
Didn't was too distracted then coming out of drive through and he ended up playing his car, flipping his car over because he went 00:40:21
off off of Smokeworth on the thing but. 00:40:26
For example, it's already been built and when I ask for anything else but like for example the movie theater where you have large 00:41:03
volumes of people going through, you have a large stretch area. Something like that would be it would be a positive conflict. Or a 00:41:08
school, for example, that would be a positive conflict. 00:41:13
Thanks. Thank you. Any other public comments? 00:41:19
And if not, drive a motion to close the public hearing. 00:41:23
I move to close the public hearing second. 00:41:28
All in favor, aye? 00:41:32
All right, umm, any other questions? 00:41:35
If not, do I have a motion? 00:41:40
Yeah, Brian, could you read that I. 00:41:43
Just for the record, one more time today. 00:41:47
The two foot or barrier buffer that you drafted up, yeah. So that didn't really change it the landscaping, but we could say how 00:41:50
can we say this generally like a physical barrier or? 00:41:57
Physical barrier. 00:42:07
A landscaping buffer or a physical barrier of at least. 00:42:11
Providing 2 to 3. 00:42:16
I. 00:42:34
I. 00:43:06
As we mentioned for a general SO, a landscaping buffer or physical barrier shall be provided to protect the sidewalk on the South 00:43:19
side of the project area. 00:43:23
Sounds good so. 00:43:28
OK. Thanks for It's open enough to staff, the staff can work with that. 00:43:30
Yeah. So with that, I moved to approve the site plan and conditional use permit as requested by Carla Mata with 50 Mil LLC with 00:43:34
the four proposed conditions that we reviewed with staff and then the additional one that was just read about the barrier on the 00:43:40
South side. 00:43:46
I second the motion. 00:43:55
All in favor. 00:43:57
Aye, all right. 00:43:58
Moving on to thank you guys. Yeah, have a good one. 00:44:01
Moving on to 4.3 site plan application for the Vineyard properties of Utah. 00:44:05
Do we need to roll call on that one? 00:44:14
OK, only, only on ordinances, right? I need that. 00:44:18
You're good question. OK. So this project is the Mill Road Industrial Park Building 7 and 8. 00:44:23
The applicant, Christopher Keffer with Vineyard Properties of Utah, is requesting approval of a site plan for building 78 of the 00:44:33
future Mill Road Industrial Park. These buildings will form part of a larger 8 building industrial complex. The buildings are to 00:44:39
be located approximately at Mill Road and 1600 N. 00:44:44
The property is owned flex office, industrial, is unestablished to foster economic development and established employment centers. 00:44:51
These buildings are basically going to be warehouse and offices. And in terms of design, the buildings are relatively identical 00:44:59
with a few differentiating features and they both measure approximately or not approximately 88,560 square feet. 00:45:07
This project does require that Metal Rd. be extended southward from 1600 N to meet the end of this property. The new city is 00:45:16
coordinating this extension of Mill Rd. with the property owner, Martin Snow. In addition, allotment adjustment must first be 00:45:22
completed before any building permit applications are accepted for this project. Post site plan approval because the. Basically 00:45:29
the lot lines that are showing. 00:45:35
Shown here in this map do not exactly match the lot lines that are. 00:45:41
Depicted within the site plan application. So there needs to be that alignment that takes place. The site measures 10, 00:45:46
approximately 10 acres in size. 00:45:52
So here are the buildings. There's two sets of elevations and they basically show different articulations in the roof lines 00:45:59
basically between one building to the other. So this this elevation is very similar to what we did in Lot 5 in Eastlake. And 00:46:07
here's a small change in the variations that I mentioned. 00:46:15
In terms of materials and surface details, each side of the building has been currently designed and treated. 00:46:25
A lot of variations and thorns, textures, materials, modulation of light and shade and color. The buildings are done with a 00:46:30
combination of materials including cement, metal trims, and flashings. These buildings have been customized to fit the aesthetic 00:46:36
of the Vimic community using finishes that reflect the color, style, and quality of the community particularly. 00:46:43
The East Lake Industrial Park and all colors are subdued earth tones and do not contrast with naturally occurring colors. In terms 00:46:49
of massing, there's an event where we work closely with the applicants. The applicant has incorporated articulation within the 00:46:56
building facades, providing recessed wall plans, variation in color variations, and roofline design and roof overhangs. 00:47:03
Fenestration also adds also aids and breaking up the building's massing. 00:47:09
As I said before, building 7 differs slightly. Differs slightly from 8IN color and roof articulation details. 00:47:17
In terms of visual interests and attractiveness, the applicant has provided 2 sizable areas on the bottom corners of the buildings 00:47:23
for users to gather and to recreate. 00:47:27
These areas contain benches and BBQ pits and it's a pretty nice addition to the project site. So I'm going to show you the site 00:47:34
plan where that's at. 00:47:39
So those two areas I'm talking about are located right here and then another one directly across this drive aisle over here. 00:47:46
No significant views of mountains or lake are being interrupted. 00:47:57
By mechanical equipment is being concealed behind the parapet walls of the building and all elements and the size of the 00:48:03
pedestrian level will achieve a human sense of scale and create visual interest at eye level. 00:48:08
In terms of circulation and traffic, this project integrates pretty well with the future pedestrian and vehicular infrastructure 00:48:16
along Mill Rd. in the future of 1400 N to the South. 00:48:21
Bathroom access has been provided along the public right of way and throughout the site, cheerful attention was given to areas 00:48:26
where pedestrians would likely interface with moving vehicles, and the site plan shows a lot of. 00:48:32
Safe features for constant pedestrian animals There's a lot of crosswalks and many platforms for the best chance to get safety 00:48:39
across the parking lots and into the site. 00:48:44
The there's an interconnected system for ADA and predestined circulation which has been provided in around the site. 00:48:50
In regards to building orientation, so we're building entrances have been oriented toward Mill Rd. the major thoroughfare that 00:48:59
will traverse this area once completed and where most pedestrian or vehicular traffic will flow from. 00:49:05
In the investor in the FOI district, applicants only need to have 5% of the site to be open space. The applicant has provided 13% 00:49:13
of the site as open space. 00:49:18
And accessible interconnected system of passive and active open spaces have been provided. The various open spaces throughout the 00:49:24
site are accessible from all points of the site basically, and building configuration provides areas of sizable open spaces for 00:49:29
the public to gather. 00:49:35
In terms of parking lot and building lighting, all areas are intended for, all areas intended for parking shall be adequately 00:49:43
eliminated during nine hours. The applicant must submit a photometric plan to establish that all areas of the parking lots have 00:49:49
been adequately lit. So that's one document that we are still waiting to receive from the applicant. And in terms of setbacks, all 00:49:55
the setbacks are met. 00:50:02
Let's talk about parking and loading. 00:50:09
All the parking aisle and star dimensions are not for the code. 231 total parking space has been provided and only 221 were 00:50:12
required. Five. They made the 5% of dispersed into your landscaping within the parking lot. 1288 parking. 88 required. Parking 00:50:20
sales have been provided even though only seven were required for the code. 00:50:28
There's two of them accessible parking stalls. 00:50:37
And the code required 22 bicycle style on parking styles and we provided 24 which will be the inverted U design. 00:50:41
And the applicant, all the other bicycle parking cells are provided on each of the building entrances, which I thought was a 00:50:54
really cool feature because it makes it really accessible for those bikes to get in and out of the out of the building and park 00:51:00
conveniently next to those entrances. The applicant has made sure that all areas where there's potential for for pedestrian 00:51:06
interfacing vehicles have been clearly demarcated and distinguished and there is no parking space on the site that is more than 00:51:12
150 feet. 00:51:18
From a clearly marked walk over the utility entrance. 00:51:23
In terms of landslipping improvements, the landscaping complements the architecture of the buildings, provides the general 00:51:28
interest and variety, provides 3 elements for all parking lots. The landscaping provides year on verification and brings up the 00:51:35
natural landscaping and highlights building features. The plants are all in in line with the Venetian Landscape Manual. 00:51:43
When a site plan for buildings one to four is submitted in the future, the applicant shall address incorporating a landscaping 00:51:51
buffer between those buildings and the regional commercial zone to the north. 00:51:58
All the plans selected are drought tolerant and appropriate to our landscaping code and the developer is proposing a series of 00:52:06
water wise plants, trees and chubs, appropriate chart, climate and ground cover. Ground covers include a variation of of crushed 00:52:13
rock mulch. There are no prohibited plants that are being proposed per the manual. 00:52:20
There is also no turf or sod proposed as part of this plan. 00:52:29
They provided an attractive public streetscape design along the future Mill Road Ext. 00:52:36
And all the trees are trench caliper and other shoves are 55 gallon in size. They're treating their storm water through a series 00:52:46
of underground underground storm water detention systems on on the West side of building. 00:52:53
On east side building 7. On the West side of building 8, they do propose a single monument. 00:53:01
Single monument, official sign, but they understand that that that signage is to be reviewed through a separate sign permit. That 00:53:09
sign also does not interrupt any of the view triangles coming in and out of that drive aisle. 00:53:16
So staff recommends approval of the site plan provided the song of missions are met. So I have 9 conditions I. 00:53:25
You're good actually phasing out some fees and make some red run directions. The applicant is subject to all federal, state and 00:53:35
local laws. Before the applicant is allowed to proceed with the billing from the application, they must have a remedy lot line 00:53:41
adjustment or amended final plot recorded at the Utah Recorder's Office to create the partials proposed within the site plan 00:53:47
application For each elevation visible from the public or private St. A minimum of five a minimum 5 foot plan date plantation 00:53:53
area. 00:53:59
Be provided and to be fair, I think they have done that. It just doesn't show consistently throughout the plan site. So in their 00:54:05
site plan, I believe it shows it and then in the landscaping plan it does not show if that's what 5 foot foundation planting area. 00:54:11
So if that can be consistent through a plant set, that's what we'd like to see. 00:54:18
Before it happens, we're not to apply for the billing permit. They must have been for the metric plan that indicates that adequate 00:54:26
land shall be provided in all parking areas, with emphasis placed on appropriate lighting at entrances and exits. The fore metric 00:54:32
plan shall also show that life from the site does not cause a negative impact on adjacent buildings and properties. 00:54:37
Here is Commission #6 the applicant must adjust the required parking calculations in their site plan set so they they have 00:54:44
different pages. This is again a consistency concern. Just they should be consistent in what what the parking correct parking 00:54:51
parking calculations are which are 220 spaces required, total spaces required, and 788 spaces required. I think the gifts differ 00:54:57
from one planet to the other. 00:55:03
The small shrub burn on the southern premier of the site. 00:55:10
Along what was it 1400 N must also measure 36 inches in height as the one required along the road. The applicant shall remove any 00:55:16
invasive species, if any, from the true legends and vegetation legend. And I play some with something that is appropriate in the 00:55:23
Tree Landscape manual. And then all trees shall be minimum of 2 inch caliper in size and all shubs shall be a minimum of five 00:55:31
gallon in size. 00:55:38
Those are all the commissions. 00:55:46
Thank you. 00:55:49
Any questions? 00:55:51
I have a question. I have a question about the the road again. So in this site plan it shows the entrance on the West which would 00:55:54
go on the extended Mill Rd. 00:56:00
But then there's also an entrance on the South. 00:56:06
But that 1400 N is a future Rd. so would there just be one in and out for both buildings off of Mill Rd. 00:56:10
Is that what's being proposed? 00:56:17
Sorry, where Morgan? 00:56:24
Oh. 00:56:28
For this for this development, I think there's one here. 00:56:31
In the middle it doesn't about 1600 N It looks like for this one there was one other. 00:56:37
And she that shows there's basically 4 similar projects. Yeah, let me pull up that master landscape plan. Sorry. 00:56:44
Yeah, right there. Here we go. 00:56:53
So I'm just wondering, is the only in and out the Mill Road or are they extending to that 14th period? 00:56:56
North as well. 00:57:02
Right now what they're showing is that I mean, and I think this would be a good time for the applicant if you want to come into 00:57:05
the microphone. 00:57:08
To to to do some back and forth, but right now we're only proposing the one entrance to Mill Rd. 00:57:13
To respond, you need to be in the microphone. 00:57:19
Yeah, this is not part of the. 00:57:29
Grayed out. 00:57:33
My name is Chris. So on this map you see the word about buildings that's supposed to be part of the. 00:57:40
OK. So that would that would be in there. So another inference right there. 00:57:50
And this is also going to be. 00:57:53
Right now, so you guys already approved the Boyer project. This is how they're going to get to their to their site because they 00:57:57
have no. 00:58:02
Way to get to their site without no Rd. being built so they need access. 00:58:07
To get to their lot as well. So we're working with them help them gain that access. 00:58:12
Through the development of Mill Rd. 00:58:20
So just to reiterate, everything here in white is accurate. Yeah. And then additionally to this, that's part of the, yeah, still 00:58:23
have two entrances in and out and then eventually three, one 1400, it's about it. Thanks. 00:58:31
That's my only question, Brian. 00:58:41
In the introduction you talked about this being a warehouse in office type configuration with warehouses normally come semi 00:58:45
trucks. So are we anticipating a fairly high volume of of semis there and and adequate turnaround space and backing up the loading 00:58:54
docks and all of that? I just don't see that detail, but it may be there, right? Yeah, I think we would expect. 00:59:02
A good volume of that coming through, but I would encourage the applicant if they could. 00:59:12
Address that issue as well. 00:59:17
My name is Gil Rand, I'm the architect on the project if I can stick over here. 00:59:23
Can you hear him all right if he's over there? 00:59:30
One second. 00:59:33
Yeah, yeah, there's some slack in that cord. 00:59:35
All right, I'm talking about. 00:59:52
Space between the buildings. 00:59:56
That space is almost 200 feet wide, so trucks can. 01:00:01
Come in here then there are loading dots. 01:00:06
All along in between. 01:00:10
And so the trucks can come in, they have plenty of room to maneuver to to back into the loading docks and then to move, be able to 01:00:13
come out. 01:00:16
As well. So there this this is then we've done projects similar to this. We're using the same dimensions and things basically 01:00:22
we've had on other projects that have worked very, very well. 01:00:27
So will the trucks be competing with vehicular traffic entering and exiting as well? Will they be using this really kind of 01:00:33
separated at least well? 01:00:38
This would be the for vehicular access to the property and then obviously they can come around to this area here, which is 01:00:44
vehicular trucks I'm seeing would come in here and utilize this and until 1400 N is in the trucks will go back out that way as 01:00:51
well. Yeah, I just, I anticipated some conflict between trucks and cars. So if that's anticipated to divide it, that would be 01:00:59
great. And I think that's pretty much how it's going to work and. 01:01:06
Whole project gets developed. 01:01:13
Then there are. 01:01:17
You have your vehicular traffic all in this middle area and truck traffic can come in also from up there and from there. And so 01:01:20
they're pretty much separated. There are places where they will cross, but other than that and that the trucks are in one area and 01:01:27
vehicles in another that help. Any other questions about that? No, that that's my question there. 01:01:35
Now, well they're also do we also anticipate some light industrial manufacturing type activity. 01:01:44
Be in addition to this warehousing and offices, will there be some assembling and building going on in the buildings? I think the 01:01:50
code would allow them to do that, but they put the plans and support that have been submitted. They haven't outlined that that 01:01:57
would be a part of this, of these two buildings at least. So that just depends on the tenant. We build those, we build the shell 01:02:04
and then the tenant says, hey, we want this. So the Lot 5, which we're working on right now, E Lake lot 5. 01:02:11
Neutral cost. 01:02:19
Is running out both those buildings. So then we're building out according to their needs, clean rooms, mixing rooms, etcetera, 01:02:21
etcetera. So it just depends on the tenant what they need, if they need our warehousing and just a small office space or if they 01:02:28
need more office and less warehousing depending on their needs, we build to accommodate the tenants that are moving in. So, so we 01:02:35
do anticipate some some light industrial type of work there. It's possible, but it just depends on the tenant like. 01:02:43
So when we build it, we have no idea who's going to move in until after they do move in. 01:02:51
We have taken the approach for parking that is kind of a mix because if you have manufacturing that's more requires more parking 01:02:57
and so we've got kind of got a mix for the about half of it could be manufacturing, the other half could be strictly warehouse. 01:03:05
Those are my questions. Any other questions, Chris, OK. 01:03:14
No. All right. If so, do I have a mountain? 01:03:22
Maureen, you wanted to state an additional, I'm going to say I would add a condition that the the phasing plan be be updated to 01:03:27
show which roads are going to be built with with this project. I just think that that that's important to have an in our record. 01:03:34
So is there a? 01:03:43
So what is that the anticipated phasing of the in the in the overall master plan that they're providing here? They're just getting 01:03:44
approval for site plan tonight for those two buildings. What I'm saying is that they update the master plan that was submitted 01:03:50
with the application to show which elements of the infrastructures, which roads are going to be built. Because right now they're 01:03:56
just showing their site. You know, I think it'd be a more complete application. It would help us out. So right now we have no 01:04:02
information on the exact phase. 01:04:08
We know just from conversations, but we would like it as part of the record, so. 01:04:14
All right. Well, I am ready to put forward a motion. I move to approve the site plan application as requested by Christopher 01:04:25
Kephart with Vineyard Properties of Utah with the proposed 9 conditions that were read by Brian and also adding the condition to 01:04:32
update the infrastructure master plan showing. 01:04:38
Which roads will go in with this project? 01:04:46
Do you have a second? A second? All in favor? 01:04:50
Hi, alright. Thank you guys. 01:04:53
Moving on to thank you guys. 01:04:56
Looks great. Moving on to 4.4 City initiated site plan application for public works. 01:04:58
Chris Wilson, Public Works Director We earlier this year, in the in last year's fiscal budget, we approved some office additions 01:05:15
in the newly constructed public works building. There was some changes and suggestions. 01:05:24
That have been brought forward by the mayor and she's. 01:05:33
We've gone through a process of purchasing a mobile classroom and placing it up there at the public works site for the four 01:05:38
additional office space. So. 01:05:44
Attached you'll see here on the screen the Public Works site. This classroom will be placed on the South side of the building and 01:05:51
renovated there to provide that additional workspace. 01:05:59
There's a few it's just a basic classroom. This was a used classroom purchased through from that was used by the Alpine School 01:06:08
District purchased through Arm City. It will it'll as you can see now, it'll be placed on that South side. There's a an existing. 01:06:16
Temporary office trailer there that will be removed and. 01:06:26
You can Scroll down a little bit more Brian to the pictures to get an idea of what that classroom looks like. It's pretty, pretty 01:06:33
basic standard. 01:06:38
Keep going down South that that's where it's at on site now. So just to raise with a skirting on a a some ramps and steps going up 01:06:46
to it. We'll face the doors towards the to the north towards the building. So we'll have access to go between the two facilities, 01:06:55
restrooms and break room facilities, all the utilized in the building that's already. 01:07:04
Just wanted to present this to the Planning Commission so you're aware of the intentions of what's going on. This will be moved 01:07:16
out on site this weekend. It was kind of a rushed, well, we, we had it reserved to move for a few months now, but to be put on 01:07:24
this location came that direction came within the last few, the last week or week and 1/2. 01:07:32
But wanted to keep everybody in the loop so you're aware of what was being. 01:07:40
But being done there. So if you have any questions I'm happy to answer. Really this is the. 01:07:45
Most I know at this point of what you know, the next steps of use of this property is besides the the projects that are going on 01:07:53
the tank and such. So if I can answer any of those, I'd be great. If not, just do you know how temporary it is. 01:08:01
No, I mean it may be more long term, like temporary 5-10 years. 01:08:11
It all depends on on budget and what it allows us to build a more permanent facility. And Chris, quick, where is the current 01:08:16
Heritage Commission storage facility in comparison with where this is? Yeah, I'm just trying to look. 01:08:25
So yeah, it's just no, no, no, no, yeah, if if you go, it's just above where this page is cut off at. 01:08:36
I'll pull up the public base map to show. 01:08:45
I can barely see. 01:08:51
Yeah. 01:09:01
Start. 01:09:04
OK. 01:09:14
So you can see there's a right where your cursors to the left. 01:09:15
I am just left down and that's where the that storage unit is. 01:09:19
Thank you. 01:09:26
So it would be considerably. 01:09:28
Correct, correct. 01:09:30
So I do think it's kind of funny that the city was talking about how this is the entrance to the city and what it needs to look 01:09:35
all pretty. And then we spent $85,000 to make the wall on the water tower look pretty even though it's going to be fully blocked. 01:09:42
And then we're putting this building in. Kind of funny to me, but that's why Chris said temporary. 01:09:49
10/5 to 10/10 years is going to be beautiful. 01:09:57
Just turning it out, I wasn't like, I'm fine with this because I wasn't fine. I was fine with the wall. 01:10:01
Not having some $85,000 fancy design on it, so just saying. Just pointing it out. 01:10:06
And is it on the South side just for the entrance, the easy back and forth? Yeah. And also so if we ever extend that building or 01:10:12
expand the the permanent structure that we would, we would want to expand it to the north to. 01:10:19
Exactly. 01:10:28
Yeah, makes sense. And of course, we're still hoping at some point on that water storage facility that's alongside the rail. 01:10:29
Then we'll be able to use that as a mural, correct? Historical depiction of mural for 300 feet or something. They made it a lot 01:10:38
smaller. Yeah, there's going to be 10. 01:10:43
Yeah, yeah. No, so we got to get Don on there too in that Planning Commission. When we approved the not doing the thing on the 01:10:51
side, they turned that over into the City Council. So that's why I wanted to bring it up, because they turned over what we decided 01:10:58
here in the Planning Commission and now they want an ugly building in front, so. 01:11:05
Yeah, yeah. I have a motion or any questions? 01:11:14
Going to add a facade on this building, yeah? 01:11:18
No more questions for me, All right. Do I have a motion? 01:11:22
Yeah, I can make a motion. I move to approve the city initiated site plan application as discussed. 01:11:28
Do I have a second? 01:11:34
All right, that's Tim all in favor, aye. All right, moving into work Session 5.1 moderate income housing plan update. 01:11:36
That is this paper, that is. 01:11:51
Of everybody. 01:11:53
Brian, again, so these are the, I just want to outline the requirements of House Bill 462 and through this bill, basically the 01:11:55
state is requiring that all municipalities update their moderate income housing plans and ours is basically outlined within the 01:12:01
general plan within the modern income housing element or chapter of the general plan. 01:12:08
These updates, in line with the requirements, are due this year October the 1st, 2022. 01:12:17
And the report that is to be attached with this will require outlines of each of our modern compiling strategies and an 01:12:24
implementation plan and timeline for each strategy. 01:12:30
Because Vineyard now has a fixed guideway public transportation station AKA Vineyard Frontrunner Station, which is opening soon, 01:12:38
Vineyard is required to select five strategies from the strategies outlined in State Code 10 Dash 98403, General Plan preparation. 01:12:46
Municipalities that meet the above requirement and adopt. 01:12:54
Two additional strategies may receive priority consideration for funding. 01:13:03
From from TIFF, from TTIS and from COVID-19 Local Assistance Matching program. So in the very least we have to get 5 to meet the 01:13:07
state requirement. 01:13:14
But we want to be able to get the additional consideration for funding, so our aim is to get the seven. 01:13:22
Our next steps are to identify what strategies we're currently meeting or working on, and then we have to select, with your help, 01:13:29
commissioners, the additional strategies to meet the minimum requirement and hopefully qualify for that. 01:13:35
Grant consideration. 01:13:44
So I pointed out and left in front of you the the, I think it's 24 strategies that are outlined within that state code that's 01:13:46
referenced. 01:13:51
Yeah, 83X. So is that 24? 01:13:58
Two fewer than 26. OK, there you go. So. 01:14:01
Yeah. So if you guys want to just look through here. 01:14:07
And then following and and proceeding Planning Commission meeting in the next meeting will kind of continue this conversation 01:14:11
because this this really is a pressing matter for us with that October 1st deadline. In speaking with Morgan, the community 01:14:18
Development director, he feels like we're basically already doing A, which is and a few others. So a is rezoned for densities 01:14:24
necessary to facilitate the production of modern income housing. 01:14:30
E which is creator allow for and reduce regulations related to internal or detached accessory going units and residential zoning. 01:14:37
F which is zone or rezone for higher density of or moderate income residential development and commercial and mixed-use zones near 01:14:46
major transit investment corridors. Other definitions around this because I mean, we got ourselves into the same issue with the 01:14:54
general plan, just saying like high medium, like it doesn't, it's all relative, right? So is there anything defined? 01:15:02
They keep it pretty general. I think they're talking more about multi family housing. But overall we have like up zoned areas. 01:15:10
There's the click farm and we provided that 55 plus. 01:15:14
Community that's detached housing, but they're smaller lots, so I think that that would count as well. 01:15:21
Other definitions over income like this is moderate income, Yeah, there are definitions for. Yeah, yeah, there are. Because I 01:15:26
think it's important as we make decisions on future development that we also. 01:15:32
Explicitly tie it to these things and explain. 01:15:40
We're asked or in some cases required to do this, but doing this also helps open up grants and, you know, future development or, 01:15:44
you know, whatever, whatever it might be. 01:15:49
So yeah, I think we just need to I think that's part of the transparency process is just explaining the thought process behind 01:15:57
some of these decisions that are made and what's intended when when you rezone or change zoning or whatever it might be. Just 01:16:04
wanted to note that exactly. And Anthony, we have to be able to put that together in a well written report to the state. So, yeah, 01:16:12
so I mean, I guess I don't, I don't really want to read through all of them, but we have good arguments for. 01:16:19
That were that were working on a EF if you guys want to write these down. 01:16:27
A EFGH. 01:16:34
RV and W. 01:16:39
That's great. And we've also. 01:16:42
RV and W Yeah. 01:16:47
So yeah, once you guys get a chance to read these, you know, we can convene again in in the next Planning Commission meeting and 01:16:50
we kind of discuss your thoughts on this and kind of the direction that you guys feel with us to move forward in. 01:16:58
So we'll just have a follow up work session with this. Is there anything else that? 01:17:07
Yeah. And but we believe we actually need eight of those. And so anyway, if you want to go through, especially the ones that we 01:17:16
pointed out those eight, what we'll do is we'll start drafting the the general plan and we'll probably move forward with those 01:17:23
eight. We'll bring it back to you to to, to discuss further if you want. There's other items, you know there's. 01:17:30
Probably another six or seven that would be fun to to work on, you know, whether or not we used to need to and that's up for 01:17:38
question. But I think just look through those if you feel like some of those are items that could really help the city or were 01:17:44
basically there, I mean we we could add those as well. 01:17:49
How does the state define moderate income housing or is it just those nebulous terms also? No, they're, they're defined. I'm 01:17:55
trying to moderate income, I believe is the 80% tile of the AMI, the area medium income, Right. And is it a percentage of that for 01:18:04
like a monthly payment? Yeah, exactly. I think is it 30%? Yeah. So 30% of the of someone making 80%. 01:18:12
AMI you know of their income would be dedicated to housing so keeping it under the rent or the mortgage? 01:18:21
My question would be. 01:18:29
It'd be interesting to know where already qualifies or if there's anywhere in Vineyard that qualifies as moderate income housing. 01:18:32
Yes, we have nothing. My guess is nothing in Vineyard currently is. So there's there's different ways that there's market rate 01:18:39
right now. That's basically where we meet the moderate income housing. It's not being restricted. And so that that's kind of the 01:18:46
higher level of regulation or policy is getting into actually DD restricting things. So you have. 01:18:54
Controls or you have you know, if it's a for sale product that that basically the sale of that can't, can't be more than whatever 01:19:02
the those standard thresholds are. And there's potential of doing that with new development. But once stuff is built, it's hard to 01:19:09
go back and get restrict unless the city or working with a partner housing group, we were able to go in and purchase existing 01:19:16
units and then. 01:19:23
Deed restrict those, but we need more staff from a. 01:19:30
From just the current market conditions because we have so much high density and, and you know, apartment units and those things. 01:19:35
But over this next year and probably next, not this year, but next year, we'll, we'll bring more in depth housing study. We'll 01:19:42
probably hire a housing consultant who does nothing but the stuff to have them analyze our current housing stock. And then we'll 01:19:49
work for opportunities of, of where we can can up our game in the, you know. 01:19:56
The low to moderate income housing. There are several other brackets too. There's the 3050% AMI. 01:20:03
You know, I mean, there's, there's a lot of other numbers, the 30% AMI that's actually an important one to to consider as well, 01:20:09
because that's the, that's basically providing housing for people who are right at the cost of, of being homeless. And so, you 01:20:14
know, I think that's your. 01:20:20
I can't remember the category is, but it's poverty, yeah. And so, yeah. And there are those folks in our community as well. So 01:20:26
having a more dynamic approach to housing, we're we're going to need to to do that and we're looking at probably next year where 01:20:32
we'll be able to put some funds towards that. 01:20:37
All right, cool. Yeah, if you could bring those numbers here. 01:20:44
The beach kind of give us an idea that would be, yeah. 01:20:47
Right. 01:20:52
Moving to commit a member and staff report and expertise especially. 01:20:55
Anything from the Commission? 01:21:00
And so really, I think I think I'll probably explain a couple times. I'll do it here and there. But if you, if you do me with a, a 01:21:04
developer, usually it's not we've always kind of looked at the Planning Commission because you're appointed, you're not really a 01:21:10
group that should be lobbied it, it can happen. But this is the opportunity for you to say like XI don't understand that AB or C 01:21:16
developer. 01:21:21
Public works, you know, took me to launch and we talked about this or that. So it's an opportunity for you to be transparent. 01:21:28
Or, you know, my brother is investing, you know, or I have stock in, you know, this, this development group and they're building. 01:21:36
So it's your, it's your opportunity to be transparent with the public. So alright. 01:21:42
Just update, we're still working on quota plan. It looks really cool. We're going to have, we're going to be asking for some 01:21:49
public outreach real soon here. 01:21:54
But yeah, designs are coming together. It's it's going to be cool. Anything from staff. Yeah. And with that, we're going to be 01:22:01
having a Facebook Live event, I think at the beginning of next month. So we'll keep talking about that woman tonight again in the 01:22:07
next time of this meeting. 01:22:13
And social media posts will come out from the city about it, so we'd love to get more input. 01:22:19
Cool and then next Wednesday at 5:00 is a joint site visit with the City Council right So if you could make it please please try 01:22:24
your best to make it we're going to meet at the dead end of 300 WI sent you guys Oh I'm sorry 400 S did that ever it stops as it 01:22:31
goes into the hallway farms now Holyfield's development, but we'll park there and then we'll we'll walk over to the future E park 01:22:39
there's lots of silos some. 01:22:46
Structure structures, we know there's interest in trying to incorporate those into, into that park or into, you know, maybe future 01:22:54
parks. And so that, that's an opportunity for us to, to be on site for about 1/2 an hour and just talk with the council about 01:23:00
what, what we kind of envision using that park for. So you got to use your imagination because it's kind of hard on your hair, but 01:23:06
there there's some really neat structures and yeah, I think we can be creative and have, have a, you know, something that's really 01:23:11
beneficial to our city. 01:23:17
Cool. So Morgan, this is kind of a continuation of our walking around the same side here a few weeks ago. Well, so this will be an 01:23:23
official like Planning Commission, City Council, you know the the public's very welcome to come, just don't need to let let us 01:23:30
know probably beforehand. 01:23:36
So anyway. 01:23:44
Yeah, I did take a kind of a tour through there with Brian and Morgan and others. 01:23:45
Maybe 3 weeks ago or. 01:23:52
We identified quite a few implements that are still there on the property that we would love to take possession out and get and 01:23:54
have moved out of there. And we discovered a few silo, two or three silos that we didn't even know were there. So you can see 2 01:24:01
pretty much that there are three other ones I think that are pretty cool that are there on the property and and there's a little 01:24:07
truck. 01:24:13
Probably 1930s forty truck. Yeah, we asked about that one. We heard, we were told by that the farmer who is leasing it right now 01:24:21
that that's already called for. Yeah. It's one of the family members that wants to restore it. Yeah. 01:24:27
But anyway, so there's some really neat things there that we hope to and the old grill barn to George looked at the barn and said 01:24:35
that essentially the barn needs to come down. It's not it's really, it would be more expensive to rehab than. But if we build 01:24:41
something similar to that, like we did a Community Center or something on the side, we could use a lot of the the the brick and 01:24:47
some of the material and incorporate that into the design. So you'd still have, you know, a modern structure that Harkins back to 01:24:53
the history of the site. It's like. 01:24:59
Kind of a fun, cool, a fun facility. All right, yo, we'll be there. 01:25:05
Yep, 5:00 in this park there in that dead end, and we'll walk over. 01:25:12
Yes, Yeah. That's good. That's good. 01:25:21
Yeah, exactly. 01:25:24
All right. Anything else? Nothing from staff. If that's it, then we will need an agenda. 01:25:26