Hi, Brooke. Can you hear me? 00:00:00
Hey, can you hear us all right on teams? 00:00:05
Yeah, I can hear you. I think that's. 00:00:12
Can we turn your volume up although? 00:00:15
All right. 00:00:18
Welcome everybody to Vineyard Planning Commission. Today is Wednesday, June 21st, 2023 and it is 6:01 PM. We'll get things 00:00:27
started. Grading is going to give us an invocation and Pledge of Allegiance. 00:00:33
Our Father in Heaven, we are grateful to be here today to discuss the affairs of Vineyard. We're grateful. 00:00:44
To live in this free country. 00:00:54
And to be able to. 00:00:57
Learn and know the. 00:01:02
Desires of our residents. 00:01:05
Father. 00:01:08
Please bless us. 00:01:11
With thy Holy Spirit as we. 00:01:13
Meet tonight and we say this in the name of Jesus Christ, Amen. 00:01:18
All right, pledge allegiance to the flag of the United States of America and to the Republic for which it stands, one nation under 00:01:27
God, indivisible, with liberty and justice for all. 00:01:34
Awesome. Thank you, Graydon. 00:01:42
The record show Commissioner Brown walked in at 602. 00:01:45
Yeah. All right. We'll move into an open session, but seeing as there are no, no citizens here, we'll just move right into the 00:01:51
meeting minutes for approval. Do I have a motion on that? I can make a motion to approve meeting minutes from the June 7th 00:01:57
meeting. Do I have a second? Second all in favor? Aye. All right, moving to business item 4.1, the site plan for Mountain America 00:02:03
Credit Union. 00:02:08
Great. I will be taking care of this. We do also have the applicants here with us on Teams. Hopefully we can hear from them if 00:02:16
needed. I'm not sure how our speakers will work, but we'll try our best. So here is just site context to show their lot. Here it's 00:02:23
the undeveloped lot in the corner of the yard right by the medical office building. 00:02:31
Right off of Mill Road and 400 N. 00:02:40
So here's our site plan. The the structure itself is just above 4500 square feet and we've gone through our zoning code. 00:02:44
Everything is adequate. They've met all of our parking concerns. They have the access to the property will be based off of that 00:02:51
440 NI think it might even be 450 that might be an error on here, but that'll be the access to the site. It does have three drive 00:02:58
through lanes for the the tellers. 00:03:05
It meets. 00:03:13
All of our landscaping, actually. I'll give them landscaping in a second. 00:03:14
Other things we did try to work with them to get the building a little bit closer to the corner, just because this is kind of the 00:03:21
start of the yard and we wanted to kind of make that be like a statement. But unfortunately there's a giant utility box in that 00:03:26
corner you can kind of see on their plans. And so they did bring their building up as far West as possible, but that box really 00:03:32
prevented them from from doing anything more. 00:03:37
They did provide some pedestrian connectivity through 400 N here. There's a sidewalk right here, as well as little gathering space 00:03:44
for some employees. 00:03:48
There's adequate crossing to the other projects throughout the yard as well. 00:03:54
That's pretty much a site plan. I can get to the elevation show you what the building looks like. So it'll add some good variety 00:04:01
to what has been built in the yard. It's it's a good looking building that has a lot of great features. It has some wood tones, 00:04:06
some some rocks and glass. 00:04:12
This is the West elevation, so this will be what's facing Mill Rd. 00:04:20
Here's their landscaping plan. There were a few things on here that we had to work with them on. Due to site triangles and other 00:04:28
utility issues. They weren't able to quite meet the tree code and putting St. trees along Mill Road right at the corner of 400 N 00:04:34
and Mill. So we just worked with them to relocate those and they had no issues with that. 00:04:40
Yeah, Everything else with landscaping, it is 0 escapes. There's no turf being proposed, which we are supportive of. 00:04:49
In that detention pond, will that be like a gravel detention? It'll be gravel, yeah. So you mentioned their landscaping has no 00:04:58
ground, correct? Correct. 00:05:03
So going into detail on that landscaping, they've provided its shrubs, native grasses, trees and whatnot. They've met our code has 00:05:10
like a required minimum number of trees of shrubs and whatnot and that they met those minimums. 00:05:17
So here's the condition for approval. I did include this in the staff report if you reviewed that. I have crossed off too as I 00:05:26
have already completed that. So the first three are standard conditionals. Approval that they pay in the outstanding fees and make 00:05:32
red line corrections. They're subject to all federal, state and local laws. They observe all ADA requirements. That 4th 1 is had 00:05:38
to do with the sidewalk on the east side of the property. It wasn't quite wide enough. 00:05:44
Our parking code allows the stalls to be shorter if they can park over his headwalk. 00:05:51
And they do. But then that made that sidewalk too short, and so we had them expand that sidewalk. 00:05:56
The other thing that detention pond was being built in the in part of it was in the PE. So we asked them to move that and they 00:06:02
were able to accomplish that and updated plans. So then the other things, the other condition of approval that we're still working 00:06:09
with them on, but it shouldn't have any impact with your vote tonight, would be that the sidewalk along the West side needs to be 00:06:16
located within the public right of way and not with improper private property unless a pee wee is in place and they're working. 00:06:24
On that right now is establishing that TV to give us access and they've been working with Naseem on that. And then the last one is 00:06:31
that engineering did a request that they provide a utility easement across the sites in Northern Property. So if there's any 00:06:37
questions, I'm happy to answer them or we can hopefully get that applicant to answer already. 00:06:44
I have two questions. Question #1. 00:06:51
ADA requirements, so looking at the site plan. 00:06:56
Go up. 00:07:02
Here so this. 00:07:05
Cross your access from the north axis from that N parking lot to here. 00:07:08
Yes. 00:07:14
Does that need to be a ramp for ADA stuff? I I don't believe so because there's no ADA stalls over there that ADA stalls are on 00:07:16
this. That's what I was just curious because I did notice there's stalls to the South and that there is a ramp coming up just a 00:07:22
little S where I just pointed to. So I just didn't know if all of them had to be because I didn't know how many ADA accesses you 00:07:29
had to provide. So that was my first question. 00:07:35
Second question with the landscaping is the detention basin deep enough that they. 00:07:43
Need to worry about the rock that they have called out being angular so that it doesn't like just fall down. That makes sense. 00:07:50
Yeah, it makes sense. I I don't know if I'm if. 00:07:59
'Cause I know I said it just didn't cause usually in in other things I've seen that usually when they have such a steep slope, 00:08:03
like a four to one slope, they'll use angular rock. But I also don't want them to have to change all the other rock to be angular. 00:08:09
So I just, that's just my question. I didn't know if it needed to be. And if they I'm sure they've designed sites in the past if 00:08:16
they had any problems with the rock essentially just like slipping down. Does that make sense? 00:08:22
At this point in the design process, the depth of the bond hasn't been established. OK. 00:08:29
But that's something that we can definitely look at, OK. 00:08:35
It just says. 00:08:45
I think it says one to two inch, but it just, it doesn't define whether or not it's cobble. So, but I also know that it's the 00:08:48
entire area as well. Like there's a whole bunch of it being used. So I don't want to have to make them bring in just a little bit 00:08:53
for that. In the plan, it says it's a four to one slope. I don't know if that's going to change or if that's official, but that's 00:08:58
what it says in this plan. 00:09:03
Yeah, they have a condition that is appropriate. Yeah, that was that would be my only question. That's all Cuz I've seen in the 00:09:08
past like on granted it was at a much longer length where it was not angular and so it didn't connect as well and it just kind of 00:09:15
fell down and then all the landscape. 00:09:21
Like that weed barrier just becomes exposed so I hate to have a pretty sight knowing that's all. 00:09:29
I will bring that up with our engineer and make sure that they have considered that factor of the rock sliding down the tension 00:09:36
pump. OK, Thank you. 00:09:40
Cool. Do we want to make a condition on that before taking motion or do we have any other? I have a couple other questions. 1 is 00:09:45
just a confirmation that the sidewalk on the on both sides that are missing now will be completed with this project. Is that 00:09:51
correct? The sidewalk on both sides, which maybe this one's already in, But yeah, so part of that the site plan is the sidewalk 00:09:57
surrounding the property essentially. OK. And with that, I know that not necessarily part of the site plan, but wondering if 00:10:03
there's any. 00:10:09
Intersection improvements for that are crosswalks or like that across. So that's something we'd have to work with because of this 00:10:17
site. They purchased a property from the yard from X development. We'd have to work with X Development on those improvements for 00:10:24
four 4450 N We're just trying to figure out what that is, but that's really the only crossing. 00:10:31
That that would be impacted by this site. 00:10:39
Yeah, the intersection at Mill Rd. OK, so 400 N this this intersection if you lived in the. 00:10:43
Corner, yeah, other corner and you banked here, would you hop in your car and drive or would there be a? So that is something we 00:10:52
are working with X development on with their construction of that multi family building. I believe in the development agreement 00:10:59
we're working with them on creating the intersection at this, yeah, lighted intersection at this corner. 00:11:05
It's not cometh a future date, OK. That was my only other call out is, you know, the more attractions they're great, but the more 00:11:13
people are going to want to go there, which is a good thing. But we want to make sure they have a Safeway to get there. 00:11:19
Cool. 00:11:27
Maybe we should just add a condition that the slope of the that detention bond maintain a three to one slope instead of four to 00:11:37
1/4 to well actually I guess 4 to one is nevermind 4 to 1 is a little a little better actually. So you said it was 4 to one. 00:11:46
That's what it says in the plans. OK, never mind. That's good then. OK, cool. Yeah, yeah, yeah. Sorry. You're good. 00:11:55
Any other questions? 00:12:03
If not, do I have a motion? 00:12:06
I can make a motion to approve site plan mountain America credit union with the. 00:12:11
These are the conditions. What's the conditions listed? 00:12:20
In the briefing, I guess. 00:12:25
OK, do I have a second? 00:12:30
Yeah, I'll second all in favor. 00:12:32
Aye. All right, passes. Thank you, guys. That building looks awesome. We're excited to see it. 00:12:35
Then as it relates to science, should we expect to see them again on that? So if they need a sign standard waiver, they'll come 00:12:42
back. They do have a standalone monument sign that they'll be placing. But if it meets our code, then they can just do it through 00:12:49
building permit. But if they want anything bigger, they'd they'd go through the sign center waiver and and I believe they're still 00:12:56
working with X dev to see if they want to be placed on the multi. 00:13:02
Tenant signs that are already existing in the development. 00:13:10
So whatever. Yeah, everything looked good in terms of science. 00:13:13
Cool, cool. Moving on to Commission member reports and expertise discussion disclosure. 00:13:18
Into port. 00:13:24
Well, I know you guys have something to report. Yeah, we can just announce this morning, I don't know if you guys saw the news 00:13:29
that Huntsman Cancer Institute has announced that they're gonna be building their second headquarters here in Vineyard in the 00:13:36
downtown area. So more news will be on that in the future. It's they, they just kind of announced that. They didn't go into much 00:13:43
details. So that'll be something coming your way in terms of site plan and whatnot. So that'll be fun to review. 00:13:49
I think that's it from our end. Morgan is currently on a trip with the World Trade Center Utah delegation. So that's why he can't 00:13:57
be here tonight. 00:14:02
Question on that. 00:14:08
I saw some some that was released by the Huntsman Institute. They're referring to Vineyard downtown as Utah City. Is that correct? 00:14:11
So that is something that the Flagborough development has point. I would have some feedback on that, but. 00:14:19
Sure. I I don't have any. It's never gonna pop up with you. Google Utah City, that's not gonna pop up. 00:14:28
Yeah, that's something that Flagbird has done on their own. I haven't. The planning department hasn't been a part of that much. So 00:14:34
that's part of the unveiling today was announcing Utah City, so. 00:14:40
Interesting. 00:14:48
One question I have follow up for staff, I know I'm probably broken record with this, but I think we're going on close to three 00:14:51
months of that trail being closed going to the train station. 00:14:57
And. 00:15:04
Just would love an update on that. I actually had some people in my neighborhood that wanted to go to the. 00:15:06
That thing this morning with the Huntsman and they're like, I'll just like walk on the trailer bike and couldn't. So curious if 00:15:12
there's an update there. 00:15:16
And you don't need to be ashamed, like just tell me the facts. What's what's, what's going on? 00:15:22
You know, door. 00:15:46
Work starter. So speaking about the trailer translation, I just texted the project chamber on a text message right now about 00:15:47
having that section open. 00:15:53
The developer has been doing a lot or not the developer, excuse me, the project, the contract has been putting a lot of effort in 00:16:00
the areas where 16 or North connects in order to meet the timelines for row pavements, especially with the finger connector 00:16:06
extension coming through Vineyard, the Vineyard connector extension. 00:16:12
Who happens to be the same as though our pipeline contractor is that they're putting out an asphalt down on the Vineyard connector 00:16:18
in the coming months or next month on that. So in order to be able to meet the timelines for that, they've been putting a lot of 00:16:27
extra effort into doing it underground connections over at in the 16 or north. That's not an excuse, so I'll make an excuse it's. 00:16:35
It's an explanation. For example, they have 1600 N closed down. 00:16:45
Last week. Earlier this week. Yeah, last week. As I, you know, I forgot, I totally forgot about it. I tried driving there to see 00:16:51
if we get to my own, well, closed sign. 00:16:55
So on that, but more specifically there to work together underneath the railroad tracks, which is obviously a big feat, especially 00:17:01
Union Pacific with that. So that's the reason it's just lower priorities than finishing that. And I hate to say lower priority, 00:17:07
but yeah, it's been a critical path. I'll say like that critical path and likely not done in the next two months. I just got text 00:17:13
back from. 00:17:19
Our inspector, he said. Possibly within the next two to four weeks. 00:17:26
Two or four weeks. Yeah. All right. So cool. Thanks. Yeah, no problem. 00:17:30
Any update on the USPS? I'll be on it. I've actually been out of the office. I had a baby. I didn't have a baby. My wife had a 00:17:36
baby. Yeah. So I've been out of the office for the past little while, so I've not had the pleasure of traveling to the post 00:17:41
office. Congratulations. There's an explanation. 00:17:46
But I will follow up on that hopefully by the next Planning Commission, which I did want to mention, we will not be holding a 00:17:54
Planning Commission the first week of July since July 5th. So the next scheduled meeting will be the 19th. 00:18:01
We should have quite a few items on the agenda for that one. OK, great. Perfect. All right. Is there anything else from staff? 00:18:08
If not, then meeting adjourned. 00:18:17
Thank you guys. 00:18:20
Cool. 00:18:22